Trafford Park Line


The Trafford Park Line is a light rail line on the Manchester Metrolink network in Greater Manchester, England, running from Pomona to the Intu Trafford Centre. Its name derives from Trafford Park, an area of the Metropolitan Borough of Trafford, and the first planned industrial estate in the world. The line opened in March 2020.

History

Between July and September 2014, Transport for Greater Manchester conducted a public consultation to build the line. In November 2014, TfGM applied for power under the Transport and Works Act 1992 to build and operate the line. In October 2016, power to build the line was granted by the Secretary of State for Transport. Construction commenced in January 2017.
The final stretch of track was laid in November 2019, with the first test trams running soon after. The line opened on 22 March 2020, eight months earlier than originally planned, despite suggestions that it might be delayed as part of a review of all Metrolink services because of the COVID-19 pandemic.

Route description

The line branches off from the Eccles Line immediately south of Pomona, where provision was made for a future junction at the south–western end when the viaduct on which it sits was built in the late 1990s. Stops have been built at Wharfside, Imperial War Museum, Village, Parkway, Barton Dock Road and the Trafford Centre. Future provision has been made to extend the line to Port Salford.
Services initially operate as a self-contained shuttle between Cornbrook and Intu Trafford Centre. Eventually they are due to be extended to operate to Crumpsall on the Bury Line by the end of 2020.

Rolling stock

To provide rolling stock for the line and other service expansions, 27 Bombardier M5000 trams were ordered; these will incorporate modifications to the existing fleet including new touch screen Vecom units for drivers.