Workington railway station


Workington railway station serves the town of Workington in Cumbria, England. The railway station is a stop on the scenic Cumbrian Coast Line south west of Carlisle. Some through trains to the Furness Line and from Sunderland stop here. The station is owned by Network Rail and managed by Northern who provide all passenger train services.

History and data

History

The first Workington station on the Cumbrian Coast Line was built in the area known as Priestgate Marsh for the Whitehaven Junction Railway. Although the WJR was opened from Maryport to Workington in 1845 the WJR was advertising for tenders for building the station at Workington in October 1846. The WJR station had a single arrival and departure platform and no platform canopy "the platform is open to the prevailing winds, and " " believe Workington is the only first-class station in Great Britain so unprovided with shelter" complained the Workington town trustees in 1858. In 1854 mis-set points led to a Maryport-Whitehaven goods train being routed into the end bay used by the Workington - Cockermouth trains: the goods train demolished the buffers and "dashed through" the booking office, the porter's office, and the gentleman's waiting room, carrying away the street wall of the station building, and finally coming to rest at the far wall of the ladies' waiting room. The booking office clerk having seen the train approaching, ensured no lives were lost but "the station" reported the Cumberland Pacquet "is of course a perfect wreck" and had to be re-built..
The London & North Western Railway took over the Whitehaven Junction and Workington & Cockermouth lines in 1866, and replaced the WJR station. The LNWR station was extended further north than the WJR one, with its principal entrance now facing Station Road; a footpath through the goods yard was suppressed, and South Quay was carried over the railway on a bridge, replacing a dangerous level crossing.
At the height of railway development, two other stations served Workington: on the Cockermouth and Workington Railway, and on the Cleator and Workington Junction Railway. - both are now closed. The station on the coast line retained first claim on Workington, but after the opening of Workington Central could be distinguished from it by local papers as 'the Workington low railway station': it could be formally known as Workington LNWR or as Workington Main; with the closure of the other stations it has reverted to being simply 'Workington' railway station. Trains from the Cockermouth and Keswick direction ended with the closure of that branch to all traffic in April 1966, the line having fallen victim to the Beeching Axe.
Junction Diagram showing the complex network which existed in the Workington area

Layout

The station was built with yellow Crewe bricks and had four tracks running through the station. Two of the tracks which are not served by platforms were once used to stable Travelling Post Office carriages. There was also a twelve road engine shed, wagon repair shops, a coaling stage, a goods shed and a stable block, all built with local sandstone. In LMS days, a new turntable was installed behind the engine shed. In British Railways days the engine shed was rebuilt with a new roof and ferro-concrete coaling stage and an ash disposal plant was built near to the new turntable. The road approach to the station entrance was remodelled in BR days when the highways near to the station were upgraded. Immediately adjacent to the southbound platform are two carriage sidings, used for stabling & servicing empty DMU sets overnight and at weekends. There is also a train crew depot here.

Facilities

The station is staffed throughout the week. There are waiting rooms and covered waiting areas on each platform, which are linked via footbridge. Step-free access is available to both platforms via ramps and a foot level crossing, though this is only open when station staff are present. Outside these times, the only available access routes have steps. A P.A system and digital information screens provide train running information.

Temporary Workington North station

As a consequence of the November 2009 Great Britain and Ireland floods, Network Rail built a temporary additional station from the existing station on waste ground off the A596 adjacent to a business park. An additional hourly shuttle train operated by Cumbrian-based Direct Rail Services on behalf of Northern Rail, running from Workington northbound to Maryport was created in the aftermath of the floods. This service started on 30 November 2009 and ran until 28 May 2010. It was initially funded by the Department for Transport at a cost of £216,000. All services between Workington and Maryport were free of charge for this period.

Services

There is generally an hourly service northbound to Carlisle and southbound to Whitehaven with most trains going onward to Barrow-in-Furness. A few through trains operate to/from Lancaster via the Furness Line.
Train operator Northern introduced a regular through service to Barrow via the coast at the May 2018 timetable change - the first such service south of Whitehaven for more than 40 years. Services run approximately hourly from mid-morning until early evening, with later trains terminating at Whitehaven. This represents a major upgrade on the former infrequent service of four per day each way to/from Whitehaven only that previously operated.