ICE T


DBAG Class 411 and Class 415 are German tilting electric multiple-unit high-speed trains in service with DB Fernverkehr, commonly known as ICE T.

Development

Following the successful inauguration of the Intercity-Express system in 1991 and the order to develop the ICE 2, in 1994 DB started plans to upgrade long-distance services using conventional lines, with higher speeds and a comfort level close to the ICE standard, using tilting electric multiple units to replace locomotive-hauled InterCity and InterRegio trains. DB assigned the name IC T to the project, with "T" standing for Triebzug.
Later, Deutsche Bahn also saw the need for a similar new train for its non-electrified routes, and started the ICT-VT project, with "VT" standing for Verbrennungstriebwagen. This development resulted in the diesel-powered ICE TD.
Deutsche Bahn developed the ICE 3, IC T and ICT-VT projects in parallel. The trains share a general styling concept, notably a lounge section in the front separated only by a glass wall from the driver's compartment, with a view forward over the tracks. Technically, the trains share a lot of components and technical layout, as well as the concept of distributed traction: in contrast to the ICE 1 and ICE 2 designs, the new units were planned not with power cars, but with peripheral underfloor motors, to reduce axle load and increase tractive effort.
At first plans were made for a three-car EMU, but in the end, capacity considerations led to a decision to create trains of two different lengths, five and seven cars, the combinations of which allow a sufficient variety of train lengths with a maximum of three trains coupled.

Production

In 1994, Deutsche Bahn placed an order for 40 trains, revised to 43 trains in 1997.
The trains were produced by a consortium led by DWA and including Siemens, DUEWAG and Fiat Ferroviaria. DWA produced the end cars, DUEWAG the middle cars, Siemens supplied the electronics and other main parts, and Fiat Ferroviaria supplied the bogies and the tilting technology.
The tilting technology is a hydraulic actuator system based on that of the Italian ETR 460 and ETR 470 second-generation Pendolino trains. In Pendolino bogies, only one axle is driven. In class 411 and class 415 motor cars, the inside axle of both bogies is motorised '.
After the German government abandoned the project of a Transrapid line between Hamburg and Berlin, Deutsche Bahn decided to upgrade its conventional line between the two cities to 230 km/h. To serve this line and increase capacity on other lines, in 2002 DB ordered an additional 28 seven-car trains from a consortium consisting of the successors of the companies in the previous one, but this time led by Siemens. This brought the total number of Class 411 trains to 60. The main changes were aimed at reducing costs.

Class 411

The second, third, fifth and sixth cars are motorised, while the end cars carry transformers supplying the next two cars. Thus each train consists of two power units of three coaches plus one unpowered middle car. The middle car can be removed, and theoretically the trains can be supplemented with an additional middle car.

Class 411, second batch

The second batch of trains display a number of smaller modifications, mainly to reduce purchase and maintenance costs. The most visible differences outside were the lack of a through window band with tinted glass, and LED matrix headlights. The most apparent differences inside were the scrapping of on-board radio and the replacement of the restaurant with a standing bar. The trains also offer 8 additional seats for a total of 390.

Class 415

Each five-car train forms a single power unit, with three motorised middle cars between two end cars carrying transformers.
Six trains are intended for domestic service, the other five for international service towards Switzerland, therefore they were also equipped with the Swiss train safety system and additional narrower pantographs for the Swiss network.
The first class 415 train was assembled in the summer of 1998, when testing began. Trials with the activated tilting system started in October 1998. Software errors delayed the commissioning. The first class 411 was delivered in early 1999.
Shortly before entering service, the product name of the trains was changed to ICE T, with "T" now standing for the English word tilt.

Service history

Class 415 entered service on 31 May 1999 between Stuttgart and Zurich. Class 411 entered service on 19 December 1999 between Berlin and Düsseldorf via Magdeburg. Later, the Berlin-Munich and Frankfurt-Leipzig-Dresden routes were added.
On 6 January 2004, one unit burnt out. Only the end cars remained intact, and have been used as temporary replacements for damaged end cars of other units.
Starting in December 2004, DB took the second batch of 28 more class 411 units into service on the upgraded line between Berlin and Hamburg. This was the first time the ICE T reached its top speed of 230 km/h in regular service. DB accepted the additional trains only after they proved themselves reliable in service, with all trains delivered by the 2006 FIFA World Cup. The trains were delivered with a standing bar in place of a restaurant; however, from 2007, all have been rebuilt with a restaurant.
Most trains have been assigned city names.
When the capacity of the Switzerland-enabled five-car trains became too low for the Stuttgart-Zürich services, in 2006 the class 415 end cars were switched with that of class 411 trains, thus forming seven-car trains suitable for services to Switzerland.
From the timetable change at the end of 2007, 15 class 411 trains modified for service in Austria connect Frankfurt and Vienna every two hours. Some of these trains come from Dortmund and go via Frankfurt to Vienna.

Service disruption

On 24 October 2008, DB temporarily removed all ICE-T trains from service after a crack was found in an axle of one of the company's fleet of trains. All the trains were to be inspected for similar cracks and repaired as necessary before DB returned them to service. DB decided to sideline the trains after consultation with Siemens, Bombardier and Alstom revealed only "unclear information" about the expected life span of the axles.
At the start of November 2008, a quarter of the trains were back in service. The ultrasonic tests progressed at a speed of two trains a week, with tests on all trains expected to be finished by February 2009. Until the reason for the axle breaks is identified, the checked trains are operated with deactivated tilting system.
In January 2009, Deutsche Bahn CEO Hartmut Mehdorn suggested that the axles would have to be replaced with a new design. Development, production and installation of the new axles would take up to two years.

ÖBB 4011

Three class 411 units from the first batch have been sold to Austria's ÖBB as class 4011. They have undergone a few changes.