West Cornwall Railway
The West Cornwall Railway was a railway company in Cornwall, Great Britain, formed in 1846 to construct a railway between Penzance and Truro. It purchased the existing Hayle Railway, and improved its main line, and built new sections between Penzance and Hayle, and between Redruth and Truro, and opened throughout in 1852.
When the Cornwall Railway reached Truro in 1859, rail travel between Penzance and London was possible, by changing trains.
Later, however, the West Cornwall company was called on to carry out certain mandatory improvements; it lacked the funds to undertake the work, and it was forced to sell its line to the "Associated Companies"—in effect the Great Western Railway, from 1 January 1866.
The main line of the West Cornwall Railway is still in operation at the present day, forming the western end of the Cornish Main Line railway.
Hayle Railway
The Hayle Railway had been opened as a mineral railway in 1837 between copper and tin mining districts near Redruth, and sea ports at Hayle and Portreath. The line was very lightly engineered, with light T-section rails on stone blocks. There were four rope-worked inclined planes on the system, which was standard gauge. Passenger traffic began to be carried on the main line between Redruth and Hayle, but the physical limitations of the system were significant.A scheme to connect Penzance and Truro
Local interests promoted a scheme to extend the Hayle Railway at each end of its main line so as to link Penzance and Truro. They formed the West Cornwall Railway company, and their proposal was to lease the extensions to the Hayle Railway and to arrange for that company to work the whole line. The atmospheric system was proposed for the Truro to Redruth section. The scheme was estimated at £160,000.However a parliamentary bill in 1845 was defeated, chiefly because of concern about the delays and inconvenience due to two rope worked inclines on the main line, at Angarrack and Penponds.
A second bill was promoted, receiving the Royal Assent on 3 August 1846, giving powers to purchase the Hayle Railway and construct deviations to eliminate the inclined planes, and to complete the route between Penzance and Truro. The company's capital was to be £500,000 with borrowing powers of £165,000, and a head office in London.
The line was to be broad gauge, "subject to the liability to lay additional rails of the gauge of any railway which might thereafter be constructed through Cornwall to Truro". The main line was to be from Carvedras in Truro, with branches to the Truro River and to Falmouth, and to Penryn and to St Ives.
Possession of the Hayle Railway was taken on 3 November 1846, the purchase price being paid in 4,000 West Cornwall shares, and by taking over the Hayle company's debts, amounting to £47,960. Money was extremely scarce at this time due to the collapse in investor confidence after the railway mania, and for some time, the new company was unable to undertake the new construction, only continuing to operate the original Hayle Railway network.
When finance became available, it was decided to build the new route sections in standard gauge, so as to avoid the expense of converting and relaying the existing Hayle Railway sections, which were already in that gauge; parliamentary powers to do so were obtained in 1850. However the powers granted were conditional upon the West Cornwall laying broad gauge rails on six months' notice from any connecting broad gauge line.
Isambard Kingdom Brunel was the company's engineer, and he proposed the use of Barlow rails, a rail section with a very wide base, that was laid directly in the ballast without sleepers or other support, with a very considerable saving in first cost. This is said to be Brunel's first experiment with this rail section. As stated, the Hayle Railway's own T-section rail and stone block track was retained where appropriate but in the event "Much reconstruction been necessary, and much of the old line between Hayle and Redruth been relaid." Several new viaducts were required, including Angarrack and Penponds, in each case on account of the deviation to by-pass the inclines.
By February 1852 the route was practically ready between Redruth and Penzance, and on 16 February 1852 the former Hayle Railway section was closed to enable the final connections to be made. On 25 February a locomotive was seen in Penzance for the first time, and on 27 February the Chairman and Directors made a trial inspection run from Redruth to Penzance. Formalities were completed and the line was ready for opening.
The new line opens
On 11 March 1852, the West Cornwall main line was opened between Penzance and the new Redruth station, without ceremony. The West Briton and Cornwall Advertiser newspaper, which had reported the directors' inspection run in detail, did not record the opening, although an accident at Hayle on 17 March was reported. The opening was announced in the Royal Cornwall Gazette on 12 March 1852 but only by publication of the timetable, rather than a description of the opening ceremony. Three passenger trains a day ran, with two on Sundays; the third class single fare from Redruth to Penzance was 1s 4d. The first class return from Redruth to Penzance was 4s 6d.Good progress was also being made with the construction of the eastern end of the route, and on 25 August 1852 there was a grand ceremonial opening of that part of the line, as far as Higher Town, on the western margin of Truro.
Infrastructure
The main line was in new construction from Penzance to a point near Trenowin Farm, east of Angarrack, then using the Hayle Railway route to near the Redruth station, but with a short new section to by-pass the Penponds inclined plane. From Redruth there was new construction to a terminal station about a mile west of Truro. This was at Higher Town, but its official name was Truro Road, although MacDermot uses the name Higher Town.The Hayle Railway branches were retained, but the line crossed the centre of Hayle on a viaduct, and the Hayle Railway terminus in Foundry Square was abandoned; a new connection descending on a gradient of 1 in 30 was provided to maintain access from the new line to the Hayle wharves; a short length of the original main line from Hayle to near Phillack north of Copperhouse Pool was also retained to serve works there.
Gradients on the new route were severe, with long climbs at 1 in 60 in the up direction and 1 in 80 in the down direction. Several new viaducts were required, and these were mostly timber trestles to Brunel's design, although mostly more lightly built than his other designs.
The Hayle Railway branches were retained, and continued with T section rails on stone blocks.
Better access to Truro
The high ground on which Truro is located had prevented the new line from approaching directly, but the Higher Town terminus was inconvenient; powers were obtained to extend the line to Newham, within the city of Truro and on the western bank of the Truro River, an arm of the River Fal. The new line made a broad southerly sweep and approached from the south. Its extent was about, and it was opened on 16 April 1855. It diverged from the line towards Truro Road a little south of that station, and the Truro Road station was disused from that date.The Cornwall Railway arrives
The Cornwall Railway was constructed to connect Plymouth and Falmouth, through Truro, as a broad gauge line. It opened from Plymouth as far as a new, more conveniently located station in Truro on the northern margin of the city in May 1859.Pursuing the object of reaching Falmouth, it constructed a line westward, involving a short tunnel, as far as the dormant West Cornwall station at Truro Road. It laid a single line of narrow gauge rails from its own station to make an end-on connection with the West Cornwall line, enabling West Cornwall trains to reach the Cornwall Railway station. This was opened in August 1860, enabling for the first time rail travel throughout from Penzance to London, but with a break of gauge at Truro.
From that time most West Cornwall passenger trains used the Cornwall Railway station, but the first westbound and last eastbound train of the day continued to use Newham until November 1863. From that time all passenger trains used the Cornwall Railway station, and Newham became a goods station.
The Cornwall Railway continued its construction towards Falmouth, and opened that line on 24 August 1863. This included an independent track from its Truro station paralleling its narrow gauge track to the West Cornwall, and diverging at Higher Town. Its broad gauge line crossed the West Cornwall's narrow gauge Newham branch on the level; the junction was known as Penwithers Junction.
A contemporary engineer's report stated that "an extensive system of signal mechanism has been erected" at the crossing, indicating that a signal interlocking was installed there; this was the first west of Exeter if not Bristol, according to MacDermot.
The topography at Penwithers Junction clearly shows that earthworks for an east curve were formed. This would have allowed through running from Newham towards the Cornwall Railway station at Truro. MacDermot states that this was formed at this time by the West Cornwall company, but that it was never completed.
A call to lay broad gauge rails
The Cornwall Railway was a broad gauge line, and there was an inconvenient break of gauge at Truro. In 1864 it gave notice to the West Cornwall company requiring it to lay broad gauge rails throughout; this was in accordance with the 1850 West Cornwall powers. The West Cornwall was quite unable to finance the required work, and had no alternative but to look for a buyer. In fact the only realistic buyer was the "Associated Companies", a group composed of the Great Western Railway, the Bristol & Exeter Railway and the South Devon Railway. The sale went through, and the Associated Companies took over the working of the line from 1 July 1865, and completed the purchase on 1 January 1866.Under the control of the Great Western Railway
The Associated Companies were in effect the Great Western Railway. A West Cornwall Committee was formed, consisting of two former West Cornwall directors and two Great Western directors to manage the line under Associated Companies ownership.They then proceeded with the work of laying broad gauge rails and to improving the very poor quality infrastructure on the West Cornwall main lines. Broad gauge goods trains started running on 6 November 1866 and passenger trains from 1 March 1867, with two through London services each way daily.
Some narrow gauge trains continued to run, and from November 1871 until the abolition of broad gauge, some goods trains ran as mixed trains, conveying wagons of both gauges in the same train.
The Associated Companies amalgamated as the Great Western Railway in 1876 and the West Cornwall system was then formally a part of that company.
The West Cornwall line was still in a weak condition, with timber trestle viaducts and poor quality track; Barlow rail and the original T-section rail on stone blocks persisted on the original branches, and the line was single throughout. The branches all remained narrow gauge only.
The timber trestle viaducts were replaced by masonry or by masonry and iron structures in the period 1885 - 1888, with the exception of the Penzance viaduct. This was largely washed away on 31 December 1868, and the railway was diverted inland until a new viaduct was completed, opening on 28 October 1871.
In May 1892 the Great Western Railway undertook the upheaval of gauge conversion, in which all broad gauge lines were converted to standard gauge. The West Cornwall system was already mixed gauge, so this only implied eventual removal of the unnecessary broad gauge rails. The opportunity was taken to reconfigure the track at Penwithers Junction, where the Falmouth line crossed the Newham line on the level. There had been two independent tracks from Truro, one narrow leading to the West Cornwall line, and one broad, leading towards Falmouth. From 1893 the two single tracks were converted to form a double line, with a full junction at Penwithers for the divergence of the Penzance and Falmouth lines. At the same time the Newham branch, now only carrying local goods for Truro, was directly accessible only from the Falmouth line.
Doubling of the single line sections started, and by 1904 nearly of the West Cornwall main line had been doubled: Chacewater to Scorrier, Redruth to Gwinear Road, Hayle to St Erth, and Marazion to Ponsandane. By 1921 only Scorrier to Redruth and St Erth to Marazion remained single.
The reconstructed Penzance viaduct of 1871 had 51 spans, originally of timber construction but with some later steel strengthening. In 1920 the viaduct was replaced with a stone faced embankment carrying double track. The Penzance station site remained very cramped, with only two short passenger platforms, and in 1937 a new goods station was opened at Ponsandane, just outside Penzance, serving the whole catchment area of Penzance, about, motor cartage having been introduced. This freed space at Penzance itself for enlargement of the passenger facilities there, and a considerable area of the foreshore was reclaimed at the eastern end of the station. This incorporated a new extended sea wall and in collaboration with the town Corporation, a public promenade was formed on it.
This enabled the passenger station to be extended to have four long platforms, and new loading banks for fish and flower traffic were built to remove these activities from the passenger station. The work was completed in 1938.
The original West Cornwall Railway branches continued in operation, but closed during the twentieth century; the Portreath and Tresavean branches closed in 1936; North Crofty closed in 1948; Roskear in 1963; Newham in 1972 and Hayle Wharves and the Phillack stub in 1982.
The main line from Penzance to Truro continues as part of the Cornish Main Line to this day.
Stations
The Hayle Railway had operated passenger calling points at Redruth, Pool, Camborne, Penponds, Gwinear, Angarrack, Copperhouse andHayle. When the West Cornwall Railway opened its new line and then extended to Newham, it had stations at
- Newham ; opened 1855, reduced to goods station only in 1863, closed in 1971
- Truro Road; sometimes known as Higher Town; opened 1852; closed 1855
- Chacewater; opened 1852; closed 1964
- Scorrier Gate; opened 1896, closed 1964
- Redruth; opened 1852
- Pool; renamed Carn Brea in 1875; closed to passengers in 1961; it was also the location of the railway's workshops
- Camborne
- Gwinear Road; this was the former Gwinear station of the Hayle Railway; it became the junction for the Helston Railway branch from 1887, and it closed in 1964
- Angarrack; a new station corresponding to the Hayle Railway station; it closed in 1853
- Hayle
- St Ives Road; renamed St Erth in 1877, when it became the junction for the newly opened branch line to St Ives
- Marazion Road; renamed Marazion from 1896, and closed in 1964
- Penzance
- When the Cornwall Railway connected its Truro station with the West Cornwall line in 1870, most West Cornwall Railway passenger trains were diverted to it; however it was wholly owned and operated by the Cornwall Railway company.
- The Hayle Railway terminus at Redruth was by-passed by the West Cornwall main line, and was reduced to the status of a goods station; it eventually closed in 1967.
- Copperhouse Halt was opened by the Great Western Railway in 1905; it was located between Angarrack and Hayle, and it was closed in 1908.
- Dulcoath Halt was opened by the Great Western Railway in 1905; it was located between Carn Brea and Camborne, and it was closed in 1908.
Major Structures
- Penwithers Viaduct, long, replaced in 1887
- Chacewater Viaduct, long, replaced in 1888
- Blackwater Viaduct, long, replaced in 1888
- Redruth Viaduct, long, replaced in 1888
- Penponds Viaduct, long, replaced 1888
- Angarrack Viaduct, long, replaced in 1885
- Guildford Viaduct, long, replaced in 1886
- Hayle Viaduct, long, replaced 1886
- Penzance Viaduct, long, reconstructed in 1871 and replaced by a double track embankment in 1921.
Locomotives
Standard gauge
The Hayle Railway contracted with J. Chanter to provide its locomotives. This contract was bought out by the West Cornwall Railway, the stock consisting of the Carn Brea, Chanter, Cornubria, Coryndon, and Pendarves.These locomotives were replaced from 1851 by an expanded fleet comprising:
- Apollo, an ex-London and North Western Railway 0-6-0
- Camborne, a Stothert and Slaughter 0-4-2T
- Carn Brea, a Stothert and Slaughter 0-4-2
- Ceres, an ex-London and North Western Railway 0-6-0
- Cyclops, an ex-London and North Western Railway 0-6-0
- Falmouth a Robert Stephenson and Company 2-4-0
- Fox, an Avonside Engine Company 0-4-0T
- Hayle, a Stothert and Slaughter 0-4-2T
- Helston, a Robert Stephenson 2-4-0
- Ironsides
- Mars, a Vulcan Foundry 0-6-0T
- Mounts Bay, a Robert Stephenson and Company 2-4-0
- Nestor, an ex-London and North Western Railway 0-6-0
- Penwith, a Sothert and Slaughter 2-4-0
- Penzance, a Stothert and Slaughter 0-4-2T
- Penzance, a Robert Stephenson 2-4-0
- Redruth, a Robert Stephenson 2-4-0
- Redruth, a Slaughter and Grunning 0-6-0
- St Just, a Robert Stephenson and Company 0-6-0
- St Ives, a Robert Stephenson and Company 2-4-0
- Truro, a Robert Stephenson and Company 2-4-0
Broad gauge
- Gorgon class 4-4-0STs
- *Pluto GWR no. 2123
- * Titan GWR no. 2126
- * Zebra GWR no. 2127
- Remus class 0-6-0STs
- * Remus GWR no. 2154
- * Romulus GWR no. 2155
- ex-Llynvi Valley Railway 0-6-0STs
- Ada GWR no. 2146
- Rosa GWR no. 2145
- Una GWR no. 2147
- Penwith 2-4-0T GWR no. 2136
- Redruth 0-6-0ST GWR no. 2156