Rail transport in Indonesia


The majority of Indonesia's railways are on Java, used for both passenger and freight transport. There are three noncontinuous railway networks in Sumatra with two new networks are being developed in Kalimantan and Sulawesi. Indonesia has finalized its plan for a national railway network recently. According to the plan, 3,200 km of train tracks that will criss-cross the islands of Sumatra, Java, Kalimantan, and Sulawesi, it has been touted as the most extensive railway project in Indonesia since its independence from the Dutch in 1945.
Urban railway exist in form of commuter rail in Jakarta, Bandung, and Surabaya. New mass rapid transit and light rail transit system are currently being introduced in Jakarta and Palembang.
Despite Indonesia has a left-hand running for roads, most of the railway lines use right-hand running due to Dutch influence.
Indonesia's rail gauge is, although and lines previously existed. Newer constructions in Aceh, Kalimantan, and Sulawesi, along with the Jakarta LRT, are using the gauge. Most of the Jakarta metropolitan area is electrified at 1500 V DC overhead.
Indonesia's railways are operated by the state-owned Kereta Api Indonesia, its commuter subsidiary, the Kereta Commuter Indonesia, and the airport rail link subsidiary, the Railink. The infrastructure is state-owned, and companies pay a fee for using the railways.
Various narrow gauge industrial tramways operate in Java and Sumatra, serving the sugarcane and oil palm industries.

History

The first railway line in Indonesia opened in 1867. The railways were gradually expanded by both the state and private companies.
The Japanese occupation and the Indonesian War of Independence left Indonesia's railways in a poor condition. A batch of 100 steam locomotives were ordered in 1950, and dieselisation started in 1953. By the 1980s most mainline services had been dieselised. Electric multiple units were obtained from Japan beginning in the 1970s, replacing 60-year-old electric locomotives.
Since the independence era, all mainline railways in Indonesia have been managed by the state. The owners of the private railway were compensated first, but the system was fully nationalised in 1971.
Construction of new railway lines has been scarce, and most new construction is concentrated on double- and quad-tracking of existing railway lines. Most of the former tramway lines have been closed, reducing the mileage from about 7000 km to only 3000 km.

Rolling stock

Preserved locomotives

Indonesia had various types of locomotives, being the legacy of the many different companies. Surprisingly, only three steam locomotives remain in operable condition, all located in the Ambarawa Railway Museum. On the other hand, static steam locomotive displays are located in the Transportation Museum in Jakarta's Taman Mini Indonesia Indah and Ambarawa Railway Museum in Central Java. Plinthed locomotives can also be found in most cities and towns. Somewhat surprisingly, few non-locomotive rolling stock were preserved.
With the Asian economic crisis of 1997, remaining hulks of steam locomotives formerly standing in former depots became valuable for their scrap value, and by 2000, most locomotives not already plinthed or sent to museums were scrapped, presumably illegally.
Four operable industrial steam locomotives are present, with two more preserved, at the Cepu Forest Railway. This currently represents the largest concentration of active preserved steam locomotives in Indonesia.
Several "last" steam locomotives were built for Indonesia. E1060, a 1966-built rack steam locomotive is operable in Ambarawa railway museum. BB84, the last Mallet locomotive built for a non-tourist railway was built by Nippon Sharyo Keizo Kaisha in 1962. This locomotive was plinthed in Banda Aceh and survived the December 2004 tsunami. The locomotive is in rather poor condition with its valve gear and cylinder pistons missing.
Steam locomotive 1622 "Sri Gunung", a mallet built in 1928, preserved in the Dutch Railway Museum.
The Trangkil No. 4 was built in 1971, being the last steam locomotive built at Hunslet's Jack Lane Works in Leeds, England. The locomotive was used on the Trangkil sugar mill estate on Java. It has been repatriated to the UK in 2004.

Diesel locomotives

As of 2016, PT Kereta Api operates about 350 units of diesel locomotives divided into classes in Java and Sumatra used both for passenger and freight services. The first diesel locomotive owned by PT Kereta Api was CC200 class, built by General Electric in 1953.

Electric trains

As of August 2017, PT Kereta Api's commuter subsidiary, Kereta Commuter Indonesia, operates 758 units of electric multiple units in Greater Jakarta area. Most EMUs operated in Jakarta are secondhand trains acquired from major urban railway operators in Greater Tokyo in Japan, such as East Japan Railway Company and Tokyo Metro.

Infrastructure

Railways on Java

The first railways in Indonesia were built on the island of Java, using gauge. During the Japanese occupation, they were converted to gauge. At its greatest extent, the Javanese network had a length of, connecting most parts of the island. The Javanese network train is divided into nine operating divisions.

Railways on Sumatra

In Sumatra as of 2013, there are 1,869 kilometres of track, of which 1,348 km are operational. Several unconnected railway networks were built in the time of the Dutch East Indies:
Plans to connect up and fix these isolated lines are included in the Trans-Sumatra Railway plan. Railway services in Sumatra by operational is divided into three regional divisions, which are:
Regional Division 1
Regional Division 2
Regional Division 3
Regional Division 4

  • Medan - Tebing Tinggi
  • Araskabu - Kualanamu
  • Tebing Tinggi - Kisaran
  • Kisaran - Kotapinang
  • Kisaran - Tanjungbalai
  • Tebing Tinggi - Siantar
  • Medan - Belawan
  • Medan - Besitang
  • Kutablang - Krueng Geukueh
  • Teluk Bayur - Sawahlunto
  • Muara Kalaban - Padang Sibusuk
  • Bukit Putus - Indarung
  • Lubuk Alung - Pariaman
  • Pariaman - Sungai Limau
  • Padang Panjang - Payakumbuh
  • Payakumbuh - Limbanang
  • Padang Sibusuk - Muaro Sijunjung
  • Padang - Pulau Air
  • Duku - Minangkabau International Airport
  • Kertapati - Prabumulih
  • Simpang - Indralaya
  • Prabumulih - Lubuk Linggau
  • Tarahan - Prabumulih
  • Railways on Kalimantan

    In 2010, plans were announced for Kalimantan to get a 122 km long railway for the transport of coal between the mine and the port of Bengalon. In January 2016, Russian Railways reported that its construction of a railway in Kalimantan will finish in 2019.

    Railways on Bali

    In 2019 it was reported in Gapura Bali that Wayan Koster, governor of Bali, "is keen to improve Bali's transportation infrastructure and is considering plans to build an electric rail network across the island".

    Railways on Sulawesi

    The Trans-Sulawesi Railway is under construction, and will be built with standard gauge which is wider than the cape gauge used in Java and Sumatra to accommodate more weight and speed.

    Railways in Papua

    A 440 km railway from Manokwari to Sorong in West Papua province is planned.

    Usage

    Passenger services

    provides extensive passenger services. Various classes are available, from "'Argo'" class with reclining seats and plane - like facilities, executive class with air conditioner and reclining seat comparable to the better classes of other countries' railways, business coaches which recently have been equipped with air conditioner and reclining seats much like executive class, to the hard bench, but still air conditioned economy class coaches for cheaper trains. In last couple of years, the business and economic class are in the process of being equipped with air conditioned system. The whole process was completed in early 2013.
    Sleeper trains have existed in Indonesia. The last all-sleeper train service was Bima express train which ran from 1967 to 1984 when it was changed to mostly coach, leaving only one or two sleeping cars. It ran in this configuration until 1995, when the sleeper cars were withdrawn and modified into seating coach. Since 2018, sleeper trains have been re-activated for the Argo Bromo Anggrek, Taksaka, Argo Lawu and Argo Dwipangga, and Gajayana.
    In Java, most trains connect Jakarta and the hinterland - regional have not been fully developed. Between pairs of important cities such as Jakarta and Bandung, intensive hourly services are provided.
    Most passenger trains in Indonesia, except commuter locals, are named. The names varies from plainly descriptive such as Depok Ekspress, through Logawa, Argo Lawu, to more or less meaningless, though romantic, names such as Bangunkarta and Matarmaja.
    Railway passenger services experienced a renaissance in the 1995-1999 period, with the introduction of many new passenger express services. With the advent of cheap airplane tickets, PT Kereta Api has experienced a downturn in the number of passengers carried, though the number has stabilized and most trains remain at more than 50% occupancy rate.

    Argo Network

    Note: K.A. Argo Gede no longer exists. As a replacement, K.A. Argo Parahyangan trains operate the same routing as a merge of K.A. Argo Gede and K.A. Parahyangan.

    Women only carriages

    As a response to many reports of sexual harassment in public places, including commuter trains and buses, PT Kereta Api launched women-only carriages in some commuter trains in Jakarta metropolitan area in August 2010.
    On May 13, 2013 PT KAI changed women-only trains to regular trains which at the front and back of the train has a coach for women only. This rule apply in KRL Jabodetabek.

    Priority seat

    PT KAI designates priority seats to elderly passengers, pregnant women, disabled passengers and mother with infant to ride public transport with an equal degree of access and comfort as other people. This apply in KRL Jabodetabek. Priority seat not only in the first and end of the train like in women only carriages, but eight seats in each carriage are designated as priority seats.

    Priority Class (Sleeper Train)

    PT KAI relaunched the Sleeper Train service in June 11, 2018. This sleeper train is equipped with excellent facilities even in the same class as a first class aircraft cabin. The first route for Sleeper Train is from Gambir Jakarta to Surabaya. The operational of the Luxury Sleeper Train will be taken over by PT KA Tourism.

    Freight services

    The railway system in Java is more or less a passenger-oriented system, and there are few freight services, due to the limited capacity of the tracks. Some notable freight service in Java include the Kalimas container train and the Parcel train between Jakarta and Surabaya, petroleum trains between refineries or oil pipe terminals and oil depots, and quartz sand trains in Central Java.
    But in recent years, there has been many efforts to increase freight traffic in Java by introducing the GE CC206 locomotives, as well as building double track lines that connect Jakarta and Surabaya on North Coast line to increase the number of container trains between both cities. Many container ports have also been built on intermediate cities and towns. This effort already attract some customers who normally shipped their products via roads.
    The system in South Sumatra is rather freight-oriented. Coal unit trains, carrying coal for an electricity plant are given priority over passenger trains. In West Sumatra, the remaining railway line serves the cement plant at Indarung, near Padang, and in North Sumatra, several oil palm and rubber plantations are served by freight trains.

    Urban rail and rail-based rapid transit

    Greater Jakarta

    is one of operational urban rail network in Indonesia, serving commuter routes in Greater Jakarta which comprises cities of DKI Jakarta, Depok, Bogor, Bekasi, Tangerang, and South Tangerang as well as regencies of Bogor, Bekasi, and Lebak. The other operational urban rail network are Jakarta MRT, Jakarta LRT, and an airport rail link to support the public transport network in the area.

    Greater Surabaya

    Regional rail functions as commuter rail in Surabaya, so technically there is no urban rail network. However, there are plans for a mass rapid transit network in and around Surabaya. A 32 km diesel line from Mojokerto to Sidoarjo has been put into service, with 6 daily return trips.

    Palembang

    had operate in June 2018, before the 2018 Asian Games.

    Medan

    has Kualanamu Airport Rail Link transport which linking Kualanamu International Airport to Medan station and vice versa.

    High-speed rail

    In recent decades, Javan transportation backbones — north coast road and railway system that serves Jakarta-Surabaya corridor, has suffered greatly from both freight and passenger congestion. The plan to build a high-speed railway system in Java has been around for many years. However, it was not until 2008 that the idea had been contemplated seriously. It was Japan International Cooperation Agency's proposal that initiated the idea to build high-speed rail for the Indonesian island of Java, linking up the densely populated corridor from the capital Jakarta to Surabaya city in East Java. Japan is eager to export their Shinkansen high-speed rail technology abroad. Following up JICA's initial study in 2012, the detailed feasibility study was concluded in 2014. In recent years, Indonesia has been undergoing a revival in railway expansion and upgrades. The high-speed rail corridors have been proposed but not implemented yet, since it was deemed too costly.
    In April 2015, China had entered the race with a counter-offer to build the Jakarta-Bandung high-speed rail in Indonesia. A bid which alarmed Japan that has been nurtured the idea for years.
    In July 2015, the Indonesian government announced their plan to build the high-speed rail system connecting Jakarta and Bandung, and devised a competition between Japan and China train-makers as potential bidders. Japan and China had expressed their interest in the project; both countries have done comprehensive studies of the project.
    In late September 2015, Indonesia awards this multibillion-dollar railway project to China over Japan.
    The proposed high-speed rail will connect the nation's capital Jakarta with Bandung city in neighboring West Java province, covering a distance of 150 kilometers, and is also expected to expand further, connecting to Indonesia's second largest city, Surabaya in East Java. The project is scheduled to commence in late 2015, and is expected to open its operations to public by 2019.
    In December 2015 discussion for the Jakarta-Surabaya high-speed rail was commenced by the Indonesian Coordinating Minister of Maritime and Resources. Academicians from two major universities in Indonesia, and employees from Japan International Cooperation Agency, were invited to attend the discussion.

    Ticket and Payment Method

    For Long Distance Train (by PT KAI)

    To buy ticket for long distance train by PT KAI, passenger can go to .

    For Urban Train (Commuter)

    To buy ticket for commuter in Jakarta or Jabodetabek area, there are three types of tickets.
    1. Daily tickets can be bought by passengers at ticket counters or in vending machines. The ticket is for one trip only.
    2. Multi-trip tickets in Indonesia are called kartu multi trip. The tickets can be bought in a ticket locket. The ticket is for multiple trips.
    3. Ticket using bank card money. The banks which have license for issuing the electronic cards are bank BRI with BRIZZI cards, bank BCA the card called Flazz, bank BNI the card called Tap Cash, and bank Mandiri the card called e-money. The ticket is for multiple trips, but the card first has to register for commuter train by simply tap the card in the red-box in the station area. These electronic money cards also can be used for paying busway fares and paying highway tickets.
    To use the card, passenger taps the card in the automatic fare gate when first entering the station and taps again when leaving the destination station.