Whitechapel station


Whitechapel is a London Underground and London Overground station located on Whitechapel Road and Durward Street in the Whitechapel area of London, United Kingdom. The station is located behind a street market of the same name and opposite the Royal London Hospital. It lies between Aldgate East and Stepney Green stations on the District and Hammersmith & City lines, and between Shoreditch High Street and Shadwell stations on the East London Line. It is in Travelcard Zone 2.
The lower section of the station was closed between 2007 and 27 April 2010 for rebuilding while the former East London Line was converted and readied for the London Overground service; it initially reopened for a preview service on 27 April 2010 with the full service starting on 23 May 2010.

History

Whitechapel station was originally opened in 1876 when the East London Railway was extended north from to Liverpool Street station. The ELR owned the tracks and stations but did not operate trains. From the beginning various railway companies provided services through Whitechapel including the London, Brighton and South Coast Railway, the London, Chatham and Dover Railway and the South Eastern Railway. Later the Great Eastern Railway added services.
On 6 October 1884 the District Railway opened a new station adjacent to the deeper ELR station as the terminus of an extension from . The new station was given the name "Whitechapel ". The ELR passenger service between Whitechapel and Liverpool Street was withdrawn in 1885. The station received its present name on 13 November 1901.
On 1 February 1902 the DR station was temporarily closed for rebuilding. It reopened on 2 June 1902 when the DR opened the Whitechapel & Bow Railway, a joint venture with the London, Tilbury and Southend Railway. The new extension ran eastwards to Bromley-by-Bow where it joined the LT&SR's tracks. DR services then operated regularly to and as far as Southend-on-Sea in the summer.
The DR tracks were electrified in 1905 and electric trains replaced steam trains. Services going eastwards were cut back to the limit of electrification at East Ham; later they were re-extended to Barking in 1908, and to Upminster in 1932. On 3 December 1906 the Metropolitan Railway extended its service to Whitechapel as the eastern terminus of its service.
The MR also ran trains over the southern section of ELR via a connection between the DR tracks west of Whitechapel and the ELR tracks north of Shadwell station. When the tracks of the ELR were electrified in 1913, the MR ended services to the DR station and extended its ELR service through Whitechapel to The change of service took place on 31 March 1913.
On 30 March 1936 the Metropolitan line began operating again through the District line station as far as.
During the 1980s, the London Transport considered converting the East London line into a light railway similar to the Docklands Light Railway, or restoring the then-disused connection to Liverpool Street reconnecting Whitechapel to Liverpool Street via Shoreditch.
The line had also become a line in its own right and from 1990 its colour on the map changed to orange. At the same time, the Hammersmith-Barking section of the Metropolitan line has also been operated separately as the Hammersmith & City line after it appeared as a completely separate line and it colour changed to pink on the tube map.
On 25 March 1995, during the construction of the Jubilee Line Extension, the East London Line was closed to allow repair works on the Thames Tunnel. General renovations and new signalling works were undertaken at the same time. The line reopened south from Whitechapel on 25 March 1998 and north from Whitechapel on 27 September 1998.
Throughout its life Whitechapel has been used extensively as an eastern terminus; however since the timetable change in December 2009 trains have reversed at Plaistow instead of Whitechapel. This is owing to operational changes related to the construction work to build one large island platform.
In preparation for the extension of the East London Line to and, the line north of Whitechapel to Shoreditch was closed on 9 June 2006. Services to Shoreditch had previously been run during peak hours and Sunday mornings only; these were replaced by a bus link.
Work on the extension of the East London line commenced and the line was closed on 22 December 2007. It reopened on 27 April 2010 when tracks on a new alignment were connected to a disused North London Line viaduct from Shoreditch to Dalston, making Whitechapel part of the London Overground network. Temporary bus services operated during the closure, of which rail replacement route ELW remained in service until the ELL fully opened on 23 May 2010. The southern extension of phase 1 from to and West Croydon was completed simultaneously with that to Dalston in 2010 and a full service began in May 2010.
In early 2015, because there were no services running on the Hammersmith & City and Circle lines between Edgware Road and Aldgate East/Tower Hill, a revised Circle line service operated between Edgware Road and Barking via Victoria. This occurred because of track, drainage replacement and station works at Euston Square, Moorgate and Liverpool Street. It was the first time a regular Circle line service had called at Whitechapel.
Due to Crossrail work that took place at Whitechapel station, Night Overground services did initially not stop at that station until works are complete. From December 9 Night Overground began to stop additionally at Whitechapel.

Design

The canopies above the station entrances were designed by Weston Williamson. Whitechapel has the unusual situation where the District and Hammersmith & City line London Underground platforms are above the East London Line London Overground platforms.

District and Hammersmith & City line

The station used to have six platforms in open cuttings north of Whitechapel Road. The Hammersmith & City and District lines had two eastbound and two westbound. There was a siding beside platform 4 track accessed from the east side of the station which can accept either 6 car C or D stock train. There was another siding from platform 1 eastbound. This was of sufficient length and signalled to hold only a six car C stock train and when it was holding a train the platform could only be used as a terminal, to reverse trains east to west, not as a through platform. The East London line has one northbound and one southbound platform. They are sited at the eastern end of the station and are in a deeper cutting.
In September 2011 the track was permanently removed from platforms 2, 3, and 4. Platform 4 has been extended over the trackbed and westbound trains use the route of the old siding which has been connected to the main line at the western end to provide a through route. This platform is renumbered platform 2. Trailing crossovers are provided at each end of the station. The two island platforms were combined to form one large island platform with a central circulating area. Escalators will eventually lead down from here to the Crossrail platforms. A new double-ended centre reversing siding has been constructed beyond to compensate for the loss of reversing facilities from Whitechapel. Since December 2009 Hammersmith & City line trains have not been scheduled to reverse at Whitechapel. Outside peak hours they currently reverse alternately at Plaistow and Barking.

St Mary's Curve

The St Mary's curve connection between the District line track and the East London Line was used for passenger traffic until 1941, but was subsequently only used to transfer empty trains to and from the other sub-surface lines. The curve was often lit and could easily be seen from the left-hand side of East London line trains entering Whitechapel station from the south, prior to the refurbishment of the East London line that commenced in late December 2007. The points on the District line, connecting it to the curve, were removed in summer 2008. Just west of Whitechapel is the site of the former station, one of the many closed London Underground stations.

London Overground

Vitreous enamel panels designed by Doug Patterson in 1997 have been installed on the East London line platforms.

Services and connections

The typical off-peak service of trains per hour is as follows:
Operator/lineFrequency to destination
London Underground 12 tph eastbound to
3 tph eastbound to Barking
6 tph westbound to Ealing Broadway
6 tph westbound to Richmond
3 tph westbound to Wimbledon
London Underground 6 tph eastbound to Barking
6 tph westbound to Hammersmith via King's Cross St. Pancras and Wood Lane
London Overground 8 tph northbound to Highbury & Islington
8 tph northbound to
4 tph southbound to West Croydon
4 tph southbound to
4 tph southbound to
4 tph southbound to

London Buses routes 25, 106, 205, 254, D3 and night routes N25, N205 and N253 serve the station.

Future developments

Crossrail

The Elizabeth Line will call at Whitechapel from autumn 2020. Eastbound services will be split into two branches after leaving the station. Work is under way to create the interchange between the Elizabeth, District and Hammersmith & City lines and the London Overground. The Elizabeth Line platforms will lie to the north of the existing station, with access being via escalators down from the District and Hammersmith & City line platforms.