Airbus A380


The Airbus A380 is a wide-body aircraft manufactured by Airbus. It is the world's largest passenger airliner.
Airbus studies started in 1988 and the project was announced in 1990 to challenge the dominance of the Boeing 747 in the long haul market.
The A3XX project was presented in 1994; Airbus launched the € billion A380 programme on 19 December 2000.
The first prototype was unveiled in Toulouse on 18 January 2005,
with its first flight on 27 April 2005.
Difficulties in electrical wiring caused a two-year delay and the development cost ballooned to €18 billion.
It obtained its type certificate from the European Aviation Safety Agency and the US Federal Aviation Administration on 12 December 2006.
It was first delivered to Singapore Airlines on 15 October 2007 and entered service on 25 October.
Production peaked at 30 per year in 2012 and 2014. However, Airbus concedes that its $25 billion investment for the aircraft cannot be recouped.
On 14 February 2019, after Emirates reduced its last orders in favour of the A350 and the A330neo, Airbus announced that A380 production would end by 2021.
The full-length double-deck aircraft, sometimes nicknamed the superjumbo, has a typical seating capacity of 525, though it is certified for up to 853 passengers.
It is powered by four Engine Alliance GP7200 or Rolls-Royce Trent 900 turbofans providing a range of.
As of December 2019, Airbus has received 251 firm orders and delivered 242 aircraft; Emirates is the biggest A380 customer with 123 ordered, of which 115 have been delivered.

Development

Background



ImageSize= width:280 height:330
PlotArea= left:50 right:0 bottom:10 top:10
DateFormat= yyyy
Period= from:1990 till:2022
TimeAxis= orientation:vertical
ScaleMajor= unit:year increment:5 start:1990
ScaleMinor= unit:year increment:1 start:1990
PlotData=
Color:yellow mark: align:left fontsize:M
shift: # shift text to right side of bar
# there is no automatic collision detection, fontsize:XS
# so shift texts up or down manually to avoid overlap shift:
at:2021 shift:15,-6 text: Scheduled end of production
at:2019 shift:15,-6 text: Discontinuation announced
at:2016 shift:15,-6 text: 200th A380-800 delivered
at:2014 shift:15,-6 text: 150th A380-800 delivered
at:2013 shift:15,-6 text: 100th A380-800 delivered
at:2011 shift:15,-6 text: 50th A380-800 delivered
at:2007 shift:15,-6 text: First A380-800 delivered
at:2006 shift:15,-6 text: Certification and delays
at:2005 shift:15,-6 text: Maiden flight
at:2004 shift:15,-6 text: First engine delivered
at:2002 shift:15,-6 text: Component-manufacturing begins
at:2001 shift:15,-6 text: Airbus consortium is merged
at:2000 shift:15,-6 text: Commercial launch of the A3XX
at:1996 shift:15,-6 text: Large Aircraft Division formed;
at:1993 shift:15,-6 text: Boeing cancels similar project
at:1991 shift:15,-6 text: Market demand researched


In mid-1988, Airbus engineers led by Jean Roeder began work in secret on the development of an ultra-high-capacity airliner, both to complete its own range of products and to break the dominance that Boeing had enjoyed in this market segment since the early 1970s with its 747. McDonnell Douglas unsuccessfully offered its double-deck MD-12 concept for sale. Lockheed was exploring the possibility for a Very Large Subsonic Transport. Roeder was given approval for further evaluations of the UHCA after a formal presentation to the President and CEO in June 1990.
The megaproject was announced at the 1990 Farnborough Airshow, with the stated goal of 15% lower operating costs than the 747–400. Airbus organised four teams of designers, one from each of its partners to propose new technologies for its future aircraft designs. The designs were presented in 1992 and the most competitive designs were used. In January 1993, Boeing and several companies in the Airbus consortium started a joint feasibility study of a Very Large Commercial Transport, aiming to form a partnership to share the limited market.
In June 1994, Airbus announced its plan to develop its own very large airliner, designated as A3XX. Airbus considered several designs, including an unusual side-by-side combination of two fuselages from its A340, the largest Airbus jet at the time. The A3XX was pitted against the VLCT study and Boeing's own New Large Aircraft successor to the 747. In July 1995, the joint study with Boeing was abandoned, as Boeing's interest had declined due to analysis that such a product was unlikely to cover the projected $15 billion development cost. Despite the fact that only two airlines had expressed public interest in purchasing such a plane, Airbus was already pursuing its own large-plane project. Analysts suggested that Boeing would instead pursue stretching its 747 design, and that air travel was already moving away from the hub-and-spoke system that consolidated traffic into large planes, and toward more non-stop routes that could be served by smaller planes.
From 1997 to 2000, as the 1997 Asian financial crisis darkened the market outlook, Airbus refined its design, targeting a 15–20% reduction in operating costs over the existing Boeing 747–400. The A3XX design converged on a double-decker layout that provided more passenger volume than a traditional single-deck design. Airbus did so in line with traditional hub-and-spoke theory, as opposed to the point-to-point theory with the Boeing 777, after conducting an extensive market analysis with over 200 focus groups. Although early marketing of the huge cross-section touted the possibility of duty-free shops, restaurant-like dining, gyms, casinos and beauty parlours on board, the realities of airline economics have kept such dreams grounded.
On 19 December 2000, the supervisory board of newly restructured Airbus voted to launch an € billion project to build the A3XX, re-designated as A380, with 50 firm orders from six launch customers. The A380 designation was a break from previous Airbus families, which had progressed sequentially from A300 to A340. It was chosen because the number 8 resembles the double-deck cross section, and is a lucky number in some Asian countries where the aircraft was being marketed. The aircraft configuration was finalised in early 2001, and manufacturing of the first A380 wing-box component started on 23 January 2002. The development cost of the A380 had grown to €11–14 billion when the first aircraft was completed.

Total development cost

In 2000, the projected development cost was €9.5 billion. In 2004 Airbus estimated that €1.5 billion would need to be added, totalling the developmental costs to € billion. In 2006, Airbus stopped publishing its reported cost after reaching costs of €10.2 billion and then it provisioned another €4.9 billion, after the difficulties in electric cabling and two years delay for an estimated total of €18 billion.
In 2014, the aircraft was estimated to have cost $25bn to develop. In 2015, Airbus said development costs were €15 billion, though analysts believe the figure is likely to be at least €5bn more for a € Bn total. In 2016, The A380 development costs were estimated at $25 billion for 15 years, $25–30 billion, or €25 billion.
To start the programme in 2000, the governments of Germany, France and the UK loaned Airbus 3.5 billion euros and refundable advances reached 5.9 billion euros.
In February 2018, after an Emirates order secured production of the unprofitable programme for ten years, Airbus revised its deal with the three loan-giving governments to save $1.4 billion : restructured terms, to lower the production rate from eight in 2019 to six per year.
On 15 May 2018, in its EU appeal ruling, a WTO ruling concluded that the A380 received improper subsidies through $9 billion of launch aids, but Airbus acknowledges that the threat posed to Boeing by the A380 is so marginal with 330 orders since its 2000 launch that any U.S. sanctions should be minimal, as previous rulings showed Boeing's exposure could be as little as $377 million.
In February 2019, the German government disclosed that it was conducting talks with Airbus regarding €600 million in outstanding loans. Following the decision to wind down the A380 programme, Europe argues that the subsidies in effect no longer exist and that no sanctions are warranted.

Production

Major structural sections of the A380 are built in France, Germany, Spain, and the United Kingdom. Due to the sections' large size, traditional transportation methods proved unfeasible, so they are brought to the Jean-Luc Lagardère Plant assembly hall in Toulouse, France, by specialised road and water transportation, though some parts are moved by the A300-600ST Beluga transport aircraft. A380 components are provided by suppliers from around the world; the four largest contributors, by value, are Rolls-Royce, Safran, United Technologies and General Electric.
For the surface movement of large A380 structural components, a complex route known as the Itinéraire à Grand Gabarit was developed. This involved the construction of a fleet of roll-on/roll-off ships and barges, the construction of port facilities and the development of new and modified roads to accommodate oversized road convoys. The front and rear fuselage sections are shipped on one of three RORO ships from Hamburg in northern Germany to Saint-Nazaire in France. The ship travels via Mostyn in the United Kingdom, where the wings are loaded. The wings are manufactured at Broughton in North Wales, then transported by barge to Mostyn docks for ship transport.
In Saint-Nazaire, the ship exchanges the fuselage sections from Hamburg for larger, assembled sections, some of which include the nose. The ship unloads in Bordeaux. The ship then picks up the belly and tail sections from Construcciones Aeronáuticas SA in Cádiz in southern Spain, and delivers them to Bordeaux. From there, the A380 parts are transported by barge to Langon, and by oversize road convoys to the assembly hall in Toulouse. To avoid damage from direct handling, parts are secured in custom jigs carried on self-powered wheeled vehicles.
After assembly, the aircraft are flown to Hamburg Finkenwerder Airport to be furnished and painted. Airbus sized the production facilities and supply chain for a production rate of four A380s per month.

Testing

Five A380s were built for testing and demonstration purposes. The first A380, registered F-WWOW, was unveiled in Toulouse 18 January 2005. It first flew on 27 April 2005. This plane, equipped with Rolls-Royce Trent 900 engines, flew from Toulouse–Blagnac Airport with a crew of six headed by chief test pilot Jacques Rosay. Rosay said flying the A380 had been "like handling a bicycle".
On 1 December 2005, the A380 achieved its maximum design speed of Mach 0.96, in a shallow dive. In 2006, the A380 flew its first high-altitude test at Addis Ababa Bole International Airport. It conducted its second high-altitude test at the same airport in 2009. On 10 January 2006, it flew to José María Córdova International Airport in Colombia, accomplishing the transatlantic testing, and then it went to El Dorado International Airport to test the engine operation in high-altitude airports. It arrived in North America on 6 February 2006, landing in Iqaluit, Nunavut in Canada for cold-weather testing.
's station on the lower deck of A380 F-WWOW
On 14 February 2006, during the destructive wing strength certification test on MSN5000, the test wing of the A380 failed at 145% of the limit load, short of the required 150% level. Airbus announced modifications adding 30 kg to the wing to provide the required strength. On 26 March 2006, the A380 underwent evacuation certification in Hamburg. With 8 of the 16 exits randomly blocked, 853 mixed passengers and 20 crew exited the darkened aircraft in 78 seconds, less than the 90 seconds required for certification. Three days later, the A380 received European Aviation Safety Agency and United States Federal Aviation Administration approval to carry up to 853 passengers.
The first A380 using GP7200 engines—serial number MSN009 and registration F-WWEA—flew on 25 August 2006. On 4 September 2006, the first full passenger-carrying flight test took place. The aircraft flew from Toulouse with 474 Airbus employees on board, in a test of passenger facilities and comfort. In November 2006, a further series of route-proving flights demonstrated the aircraft's performance for 150 flight hours under typical airline operating conditions., the A380 test aircraft continue to perform test procedures.
Airbus obtained type certificates for the A380-841 and A380-842 model from the EASA and FAA on 12 December 2006 in a joint ceremony at the company's French headquarters, receiving the ICAO code A388. The A380-861 model was added to the type certificate on 14 December 2007.

Production and delivery delays

Initial production of the A380 was troubled by delays attributed to the of wiring in each aircraft. Airbus cited as underlying causes the complexity of the cabin wiring, its concurrent design and production, the high degree of customisation for each airline, and failures of configuration management and change control. The German and Spanish Airbus facilities continued to use CATIA version 4, while British and French sites migrated to version 5. This caused overall configuration management problems, at least in part because wire harnesses manufactured using aluminium rather than copper conductors necessitated special design rules including non-standard dimensions and bend radii; these were not easily transferred between versions of the software.
Airbus announced the first delay in June 2005 and notified airlines that deliveries would be delayed by six months. This reduced the total number of planned deliveries by the end of 2009 from about 120 to 90–100. On 13 June 2006, Airbus announced a second delay, with the delivery schedule slipping an additional six to seven months. Although the first delivery was still planned before the end of 2006, deliveries in 2007 would drop to only 9 aircraft, and deliveries by the end of 2009 would be cut to 70–80 aircraft. The announcement caused a 26% drop in the share price of Airbus' parent, EADS, and led to the departure of EADS CEO Noël Forgeard, Airbus CEO Gustav Humbert, and A380 programme manager Charles Champion. On 3 October 2006, upon completion of a review of the A380 programme, Airbus CEO Christian Streiff announced a third delay, pushing the first delivery to October 2007, to be followed by 13 deliveries in 2008, 25 in 2009, and the full production rate of 45 aircraft per year in 2010. The delay also increased the earnings shortfall projected by Airbus through 2010 to €4.8 billion.
As Airbus prioritised the work on the A380-800 over the A380F, freighter orders were cancelled by FedEx and United Parcel Service, or converted to A380-800 by Emirates and ILFC. Airbus suspended work on the freighter version, but said it remained on offer, albeit without a service entry date. For the passenger version Airbus negotiated a revised delivery schedule and compensation with the 13 customers, all of which retained their orders with some placing subsequent orders, including Emirates, Singapore Airlines, Qantas, Air France, Qatar Airways, and Korean Air.
Beginning in 2007 the A380 was considered as a potential replacement for the existing Boeing VC-25 serving as Air Force One presidential transport, but in January 2009 EADS declared that they were not going to bid for the contract, as assembling only three planes in the US would not make financial sense.
On 13 May 2008, Airbus announced reduced deliveries for the years 2008 and 2009. After further manufacturing setbacks, Airbus announced its plan to deliver 14 A380s in 2009, down from the previously revised target of 18. A total of 10 A380s were delivered in 2009. In 2010 Airbus delivered 18 of the expected 20 A380s, due to Rolls-Royce engine availability problems. Airbus planned to deliver "between 20 and 25" A380s in 2011 before ramping up to three a month in 2012. In fact, Airbus delivered 26 units, thus outdoing its predicted output for the first time., production was 3 aircraft per month. Among the production problems are challenging interiors, interiors being installed sequentially rather than concurrently as in smaller planes, and union/government objections to streamlining.

Entry into service

Nicknamed Superjumbo, the first A380, MSN003, was delivered to Singapore Airlines on 15 October 2007 and entered service on 25 October 2007 with flight number SQ380 between Singapore and Sydney. Passengers bought seats in a charity online auction paying between $560 and $100,380. Two months later, Singapore Airlines CEO Chew Choong Seng stated the A380 was performing better than either the airline or Airbus had anticipated, burning 20% less fuel per seat-mile than the airline's 747-400 fleet. Emirates' Tim Clark claimed that the A380 has better fuel economy at Mach 0.86 than at 0.83, and that its technical dispatch reliability is at 97%, the same as Singapore Airlines. Airbus is committed to reach the industry standard of 98.5%.
Emirates was the second airline to receive the A380 and commenced service between Dubai and New York in August 2008. Qantas followed, with flights between Melbourne and Los Angeles in October 2008. By the end of 2008, 890,000 passengers had flown on 2,200 flights.
In February 2009, the one millionth passenger was flown with Singapore Airlines and by May of that year 1,500,000 passengers had flown on 4,200 flights. Air France received its first A380 in October 2009. Lufthansa received its first A380 in May 2010. By July 2010, the 31 A380s then in service had transported 6 million passengers on 17,000 flights between 20 international destinations.
Airbus delivered the 100th A380 on 14 March 2013 to Malaysia Airlines. In June 2014, over 65 million passengers had flown the A380, and more than 100 million passengers by September 2015, with an availability of 98.5%. In 2014, Emirates stated that its A380 fleet had load factors of 90–100%, and that the popularity of the aircraft with its passengers had not decreased in the past year.

Improvements and upgrades

In 2010, Airbus announced a new A380 build standard, incorporating a strengthened airframe structure and a 1.5° increase in wing twist. Airbus will also offer, as an option, an improved maximum take-off weight, thus providing a better payload/range performance. Maximum take-off weight is increased by, to and the range is extended by ; this is achieved by reducing flight loads, partly from optimising the fly-by-wire control laws. British Airways and Emirates are the first two customers to have received this new option in 2013. Emirates has asked for an update with new engines for the A380 to be competitive with the 777X around 2020, and Airbus is studying 11-abreast seating.
In 2012, Airbus announced another increase in the A380's maximum take-off weight to, a 6 t increase from the initial A380 variant and 2 t higher than the increased-weight proposal of 2010. Its range will increase by some, taking its capability to around at current payloads. The higher-weight version was offered for introduction to service early in 2013.

Post-delivery problems

During repairs following the Qantas Flight 32 engine failure incident, cracks were discovered in wing fittings. As a result, the European Aviation Safety Agency issued an Airworthiness Directive in January 2012 which affected 20 A380 aircraft that had accumulated over 1,300 flights. A380s with under 1,800 flight hours were to be inspected within 6 weeks or 84 flights; aircraft with over 1,800 flight hours were to be examined within four days or 14 flights. Fittings found to be cracked were replaced. On 8 February 2012, the checks were extended to cover all 68 A380 aircraft in operation. The problem is considered to be minor and is not expected to affect operations. EADS acknowledged that the cost of repairs would be over $130 million, to be borne by Airbus. The company said the problem was traced to stress and material used for the fittings. Additionally, major airlines are seeking compensation from Airbus for revenue lost as a result of the cracks and subsequent grounding of fleets. Airbus has switched to a different type of aluminium alloy so aircraft delivered from 2014 onwards should not have this problem.
Airbus is changing about 10% of all doors, as some leak during flight. One occurrence resulted in dropped oxygen masks and an emergency landing. The switch is expected to cost over €100 million. Airbus states that safety is sufficient, as the air pressure pushes the door into the frame.

Further continuation of programme

At the July 2016 Farnborough Airshow Airbus announced that in a "prudent, proactive step," starting in 2018 it expected to deliver 12 A380 aircraft per year, down from 27 deliveries in 2015. The firm also warned production might slip back into red ink on each aircraft produced at that time, though it anticipated production would remain in the black for 2016 and 2017. "The company will continue to improve the efficiency of its industrial system to achieve breakeven at 20 aircraft in 2017 and targets additional cost reduction initiatives to lower breakeven further." Airbus expected that healthy demand for its other aircraft would allow it to avoid job losses from the cuts.
As Airbus expected to build 15 airliners in 2017 and 12 in 2018, Airbus Commercial Aircraft president Fabrice Brégier said that, without orders in 2017, production would be reduced below one per month while remaining profitable per unit and allowing the programme to continue for 20 to 30 years.
In its 2017 half-year report, Airbus adjusted 2019 deliveries to eight aircraft.
In November 2017, its chief executive Tom Enders was confident Airbus would still produce A380s in 2027 with more sales to come, and further develop it to keep it competitive beyond 2030.
Airbus was profitable at a rate of 15 per year and is trying to drive breakeven down further but will take losses at eight per year.
An order from Emirates for 36 A380s would have ensured production beyond 2020, but the airline wanted guarantees that production would be maintained for 10 years, until 2028: reducing output to six a year would help to bridge that period and would support second-hand values while other buyers are approached, but the programme would still be unprofitable. If it had failed to win the Emirates order, Airbus claimed that it was ready to phase out its production gradually as it fulfilled remaining orders until the early 2020s. In January 2018, Emirates confirmed the order for 36 A380s, but the deal was thrown back into question in October 2018 over a disagreement regarding engine fuel burn.
To extend the programme, Airbus offered China a production role in early 2018. While state-owned Chinese airlines could order A380s, it would not help their low yield, as it lowers frequency; they do not need more volume as widebody aircraft are already used on domestic routes and using the A380 on its intended long haul missions would free only a few airport slots.
After achieving efficiencies to sustain production at a lower level, in 2017 Airbus delivered 15 A380s and was "very close" to production breakeven, expecting to make additional savings as production was being further reduced: it planned to deliver 12 in 2018, eight in 2019 and six per year from 2020 with "digestible" losses.
, Enders was confident the A380 would gain additional orders from existing or new operators, and saw opportunities in Asia and particularly in China where it is "under-represented".

End of production

In February 2019, Airbus announced it will end the A380 production by 2021, after its main customer, Emirates, agreed to drop an order for 39 of the aircraft, replacing it with 40 A330-900s and 30 A350-900s. Airbus will build 17 more A380s before closing the production line14 for Emirates and three for All Nippon Airwaystaking the total number of expected deliveries of the aircraft type to 251. Airbus would have needed more than $90 million profit from the sale of each aircraft to cover the estimated $25 billion development cost of the programme. However, the $445 million price tag of each aircraft was not sufficient to even cover the production cost, so with Airbus losing money on each A380, and orders evaporating, it made economic sense to shut down production. Enders stated on 14 February 2019, "If you have a product that nobody wants anymore, or you can sell only below production cost, you have to stop it."
One reason that the A380 did not achieve commercial viability for Airbus has been attributed to its extremely large capacity being optimised for a hub-and-spoke system, which was projected by Airbus to be thriving when the programme was conceived. However, airlines underwent a fundamental transition to a point-to-point system, which gets customers to their destination in one flight instead of two or three. The massive scale of the A380 design was able to achieve a very low cost for passenger seat-distance, but efficiency within the hub-and-spoke paradigm was not able to overcome the efficiency of fewer flights required in the point-to-point system. Specifically, US based carriers had been using a multihub strategy, which only justified the need for a handful of VLAs such as the A380, and having too few VLAs meant that they could not achieve economy of scale to spread out the enormous fixed cost of the VLA support infrastructure. Consequently, orders for VLAs slowed in the mid-2010s, as widebody twin jets now offer similar range and greater fuel efficiency, giving airlines more flexibility at a lower upfront cost.

Design

Overview

The A380 was initially offered in two models: the A380-800 and the A380F.
The A380-800's original configuration carried 555 passengers in a three-class configuration or 853 passengers in a single-class economy configuration. Then in May 2007, Airbus began marketing a configuration with 30 fewer passengers —traded for more range—to better reflect trends in premium-class accommodation. The design range for the A380−800 model is ; capable of flying from Hong Kong to New York or from Sydney to Istanbul non-stop.
The second model, the A380F freighter, would have carried of cargo over a range of. Freighter development was put on hold as Airbus prioritised the passenger version, and all orders for freighters were cancelled.
Other proposed variants included an A380-900 stretchseating about 656 passengers and an extended-range version with the same passenger capacity as the A380-800.

Engines

The A380 is offered with the Rolls-Royce Trent 900 or the Engine Alliance GP7000 turbofan engines.
The Trent 900 is a combination of the fan and scaled compressor of the 777-200X/300X Trent 8104 technology demonstrator derived from the Boeing 777's Trent 800, and the Airbus A340-500/600's Trent 500 core.
The GP7200 core technology is derived from GE's GE90 and its sections are based on the PW4000 expertise.
At its launch in 2000, engine makers assured Airbus it was getting the best level of technology and they would be state-of-the-art for the next decade, but three years later Boeing launched the 787 Dreamliner with game-changing technology and 10% lower fuel burn than the previous generation, to the dismay of John Leahy.
Due to its modern engines and aerodynamic improvements, Lufthansa's A380s produce half the noise of the Boeing 747-200 while carrying 160 more passengers.
In 2012, the A380 received an award from the Noise Abatement Society.
London Heathrow is a key destination for the A380.
The aircraft is below the QC/2 departure and QC/0.5 arrival noise limits under the Quota Count system set by the airport.
Field measurements suggest the approach quota allocation for the A380 may be overly generous compared to the older Boeing 747, but still quieter.
Rolls-Royce is supporting the CAA in understanding the relatively high A380/Trent 900 monitored noise levels.
Heathrow's landing charges having a noise component, the A380 is cheaper to land there than a Boeing 777-200 and -300 and it saves $4,300 to $5,200 per landing, or $15.3M to $18.8M of present value over 15 years. Tokyo Narita has a similar noise charge.
Sufficient braking capacity allowed for thrust reversers to be installed on only the inboard engines.
The outboard engines lack them, reducing the amount of debris stirred up during landing.
The reversers are electrically actuated to save weight, and for greater reliability than pneumatic or hydraulic equivalents.

Wings

The A380's wings are sized for a maximum takeoff weight over 650 tonnes to accommodate these future versions, albeit with some internal strengthening required on the A380F freighter. The optimal wingspan for this weight is about, but airport restrictions have limited it to less than, thereby lowering the aspect ratio to 7.8 which reduces fuel efficiency about 10% and increases operating costs a few percent, given that fuel costs constitute about 50% of the cost of long-haul aeroplane operation.
The common wing design approach sacrifices fuel efficiency on the A380-800 passenger model because of its weight, but Airbus estimates that the aircraft's size and advanced technology will provide lower operating costs per passenger than the 747–400. The wings incorporate wingtip fences that extend above and below the wing surface, similar to those on the A310 and A320. These increase fuel efficiency and range by reducing induced drag. The wingtip fences also reduce wake turbulence, which endangers following aircraft.

Materials

While most of the fuselage is made of aluminium alloys, composite materials comprise more than 20% of the A380's airframe. Carbon-fibre reinforced plastic, glass-fibre reinforced plastic and quartz-fibre reinforced plastic are used extensively in wings, fuselage sections, tail surfaces, and doors. The A380 is the first commercial airliner to have a central wing box made of carbon–fibre reinforced plastic. It is also the first to have a smoothly contoured wing cross–section. The wings of other commercial airliners are partitioned span-wise into sections. This flowing continuous cross section reduces aerodynamic drag. Thermoplastics are used in the leading edges of the slats.
The hybrid fibre metal laminate material GLARE is used in the upper fuselage and on the stabilisers' leading edges. This aluminium-glass-fibre laminate is lighter and has better corrosion and impact resistance than conventional aluminium alloys used in aviation. Unlike earlier composite materials, GLARE can be repaired using conventional aluminium repair techniques. The application of GLARE on the A380 has a long history, which shows the complex nature of innovations in the aircraft industry.
Newer weldable aluminium alloys are used in the A380's airframe. This enables the widespread use of laser beam welding manufacturing techniques, eliminating rows of rivets and resulting in a lighter, stronger structure. High-strength aluminium reinforced with carbon fibre was used in the wing brackets of the first 120 A380s to reduce weight, but cracks have been discovered and new sets of the more critical brackets will be made of standard aluminium 7010, increasing weight by 90 kg. Repair costs for earlier aircraft are expected to be around €500 million.
It takes of paint to cover the exterior of an A380. The paint is five layers thick and weighs about 650 kg when dry.

Avionics

The A380 employs an integrated modular avionics architecture, first used in advanced military aircraft, such as the Lockheed Martin F-22 Raptor, Lockheed Martin F-35 Lightning II, and Dassault Rafale. The main IMA systems on the A380 were developed by the Thales Group. Designed and developed by Airbus, Thales and Diehl Aerospace, the IMA suite was first used on the A380. The suite is a technological innovation, with networked computing modules to support different applications. The data networks use Avionics Full-Duplex Switched Ethernet, an implementation of ARINC 664. These are switched, full-duplex, star-topology and based on 100baseTX fast-Ethernet. This reduces the amount of wiring required and minimises latency.
Airbus used similar cockpit layout, procedures and handling characteristics to other Airbus aircraft, reducing crew training costs. The A380 has an improved glass cockpit, using fly-by-wire flight controls linked to side-sticks. The cockpit has eight liquid crystal displays, all physically identical and interchangeable; comprising two primary flight displays, two navigation displays, one engine parameter display, one system display and two multi-function displays. The MFDs were introduced on the A380 to provide an easy-to-use interface to the flight management system—replacing three multifunction control and display units. They include QWERTY keyboards and trackballs, interfacing with a graphical "point-and-click" display system.
The Network Systems Server is the heart of A380s paperless cockpit; it eliminates bulky manuals and traditional charts. The NSS has enough inbuilt robustness to eliminate onboard backup paper documents. The A380s network and server system stores data and offers electronic documentation, providing a required equipment list, navigation charts, performance calculations, and an aircraft logbook. This is accessed through the MFDs and controlled via the keyboard interface.

Systems

flight control actuators have been used for the first time in civil aviation to back up primary hydraulic actuators. Also, during certain manoeuvres they augment the primary actuators. They have self-contained hydraulic and electrical power supplies. Electro-hydrostatic actuators are used in the aileron and elevator, electric and hydraulic motors to drive the slats as well as electrical backup hydrostatic actuators for the rudder and some spoilers.
The A380's 350 bar hydraulic system is a significant difference from the typical 210 bar hydraulics used on most commercial aircraft since the 1940s. First used in military aircraft, high-pressure hydraulics reduce the weight and size of pipelines, actuators and related components. The 350 bar pressure is generated by eight de-clutchable hydraulic pumps. The hydraulic lines are typically made from titanium; the system features both fuel- and air-cooled heat exchangers. Self-contained electrically powered hydraulic power packs serve as backups for the primary systems, instead of a secondary hydraulic system, saving weight and reducing maintenance.
The A380 uses four 150 kVA variable-frequency electrical generators, eliminating constant-speed drives and improving reliability. The A380 uses aluminium power cables instead of copper for weight reduction. The electrical power system is fully computerised and many contactors and breakers have been replaced by solid-state devices for better performance and increased reliability.
The auxiliary power comprises the Auxiliary Power Unit, the electronic control box, and mounting hardware. The APU in use on the A380 is the PW 980A APU. The APU primarily provides air to power the Analysis Ground Station on the ground and to start the engines. The AGS is a semi-automatic analysis system of flight data that helps to optimise management of maintenance and reduce costs. The APU also powers electric generators that provide auxiliary electric power to the aircraft.

Passenger provisions

The A380-800's cabin has of usable floor space, 40% more than the next largest airliner, the Boeing 747-8.
The cabin has features to reduce traveller fatigue such as a quieter interior and higher pressurisation than previous generations of aircraft; the A380 is pressurised to the equivalent altitude of up to. It has 50% less cabin noise, 50% more cabin area and volume, larger windows, bigger overhead bins, and extra headroom versus the 747–400. Seating options range from 3-room "residence" in first class to 11-across in economy. A380 economy seats are up to wide in a 10-abreast configuration, compared with the 10-abreast configuration on the 747-400 that typically has seats wide. On other aircraft, economy seats range from in width.
The A380's upper and lower decks are connected by two stairways, one fore and one aft, with both being wide enough to accommodate two passengers side by side; this cabin arrangement allows multiple seat configurations. The maximum certified carrying capacity is 853 passengers in an all-economy-class layout, Airbus lists the "typical" three-class layout as accommodating 525 passengers, with 10 first, 76 business, and 439 economy class seats. Airline configurations range from Korean Air's 407 passengers to Emirates' two-class 615 seats and average around 480–490 seats. The Air Austral's proposed 840 passenger layout has not come to fruition. The A380's interior illumination system uses bulbless LEDs in the cabin, cockpit, and cargo decks. The LEDs in the cabin can be altered to create an ambience simulating daylight, night, or intermediate levels. On the outside of the aircraft, HID lighting is used for brighter illumination.
Airbus's publicity has stressed the comfort and space of the A380 cabin, and advertised onboard relaxation areas such as bars, beauty salons, duty-free shops, and restaurants. Proposed amenities resembled those installed on earlier airliners, particularly 1970s wide-body jets, which largely gave way to regular seats for more passenger capacity. Airbus has acknowledged that some cabin proposals were unlikely to be installed, and that it was ultimately the airlines' decision how to configure the interior. Industry analysts suggested that implementing customisation has slowed the production speeds, and raised costs. Due to delivery delays, Singapore Airlines and Air France debuted their seat designs on different aircraft prior to the A380.
Initial operators typically configured their A380s for three-class service, while adding extra features for passengers in premium cabins. Launch customer Singapore Airlines introduced partly enclosed first class suites on its A380s in 2007, each featuring a leather seat with a separate bed; center suites could be joined to create a double bed. A year later, Qantas debuted a new first class seat-bed and a sofa lounge at the front of the upper deck on its A380s, and in 2009 Air France unveiled an upper deck electronic art gallery. In late 2008, Emirates introduced "shower spas" in first class on its A380s allowing each first class passenger five minutes of hot water, drawing on 2.5 tonnes of water although only 60% of it was used.
Etihad Airways and Qatar Airways also have a bar lounge and seating area on the upper deck, while Etihad has enclosed areas for two people each. In addition to lounge areas, some A380 operators have installed amenities consistent with other aircraft in their respective fleets, including self-serve snack bars, premium economy sections, and redesigned business class seating.
The Hamburg Aircraft Interiors Expo in April 2015 saw the presentation of an 11-seat row economy cabin for the A380. Airbus is reacting to a changing economy; the recession which began in 2008 saw a drop in market percentage of first class and business seats to six percent and an increase in budget economy travellers. Among other causes is the reluctance of employers to pay for executives to travel in First or Business Class. Airbus' chief of cabin marketing, Ingo Wuggestzer, told Aviation Week and Space Technology that the standard three class cabin no longer reflected market conditions. The 11 seat row on the A380 is accompanied by similar options on other widebodies: nine across on the Airbus A330 and ten across on the A350.

Integration with infrastructure and regulations

Ground operations

In the 1990s, aircraft manufacturers were planning to introduce larger planes than the Boeing 747. In a common effort of the International Civil Aviation Organization with manufacturers, airports and its member agencies, the "80-metre box" was created, the airport gates allowing planes up to wingspan and length to be accommodated. Airbus designed the A380 according to these guidelines, and to operate safely on Group V runways and taxiways with a loadbearing width. The US FAA initially opposed this, then in July 2007, the FAA and EASA agreed to let the A380 operate on runways without restrictions. The A380-800 is approximately 30% larger in overall size than the 747–400. Runway lighting and signage may need changes to provide clearance to the wings and avoid blast damage from the engines. Runways, runway shoulders and taxiway shoulders may be required to be stabilised to reduce the likelihood of foreign object damage caused to the outboard engines, which are more than from the centre line of the aircraft, compared to for the 747-400, and 747-8.
Airbus measured pavement loads using a 540-tonne ballasted test rig, designed to replicate the landing gear of the A380. The rig was towed over a section of pavement at Airbus' facilities that had been instrumented with embedded load sensors. It was determined that the pavement of most runways will not need to be reinforced despite the higher weight, as it is distributed on more wheels than in other passenger aircraft with a total of 22 wheels. The A380 undercarriage consists of four main landing gear legs and one noseleg, with the two inboard landing gear legs each supporting six wheels.
The A380 requires service vehicles with lifts capable of reaching the upper deck, as well as tractors capable of handling the A380's maximum ramp weight. When using two jetway bridges the boarding time is 45 min, and when using an extra jetway to the upper deck it is reduced to 34 min. The A380 has an airport turnaround time of 90–110 minutes. In 2008 the A380 test aircraft were used to trial the modifications made to several airports to accommodate the type.

Takeoff and landing separation

In 2005, the ICAO recommended that provisional separation criteria for the A380 on takeoff and landing be substantially greater than for the 747 because preliminary flight test data suggested a stronger wake turbulence. These criteria were in effect while the ICAO's wake vortex steering group, with representatives from the JAA, Eurocontrol, the FAA, and Airbus, refined its 3-year study of the issue with additional flight testing. In September 2006, the working group presented its first conclusions to the ICAO.
In November 2006, the ICAO issued new interim recommendations. Replacing a blanket separation for aircraft trailing an A380 during approach, the new distances were, and respectively for non-A380 "Heavy", "Medium", and "Light" ICAO aircraft categories. These compared with the, and spacing applicable to other "Heavy" aircraft. Another A380 following an A380 should maintain a separation of. On departure behind an A380, non-A380 "Heavy" aircraft are required to wait two minutes, and "Medium"/"Light" aircraft three minutes for time based operations. The ICAO also recommends that pilots append the term "Super" to the aircraft's callsign when initiating communication with air traffic control, to distinguish the A380 from "Heavy" aircraft.
In August 2008, the ICAO issued revised approach separations of for Super, for Heavy, for medium/small, and for light. In November 2008, an incident on a parallel runway during crosswinds made the Australian authorities change procedures for those conditions.
Singapore Airlines describe the A380's landing speed of as "impressively slow".

Maintenance

As the A380 fleet grows older, airworthiness authority rules require certain scheduled inspections from approved aircraft tool shops. The increasing fleet size cause expected maintenance and modification to cost $6.8 billion for 2015–2020, of which $2.1 billion are for engines. Emirates performed its first 3C-check for 55 days in 2014. During lengthy shop stays, some airlines will use the opportunity to install new interiors.

Variants proposed but not produced

A380F

Airbus offered a cargo aircraft variant since at least June 2005, capable of transporting a maximum payload over a range. It would have had 7% better payload and better range than the Boeing 747-8F, but also higher trip costs. It would have the largest payload capacity of any freighter aircraft except the single Antonov An-225 Mriya in service.
Production was suspended until the A380 production lines had settled, with no firm availability date. The A380F was displayed on The Airbus website until at least January 2013, but was not anymore in April.
A patent for "combi" version was applied for. This version would offer the flexibility of carrying both passengers and cargo, along with being rapidly reconfigurable to expand or contract the cargo area and passenger area as needed for a given flight.

Stretch

At launch in December 2000, a 656-seat A380-200 was proposed as a derivative of the 555-seat baseline.
In November 2007, Airbus top sales executive and chief operating officer John Leahy confirmed plans for an enlarged variant—the A380-900—with more seating space than the A380-800. The A380-900 would have had a seating capacity for 650 passengers in standard configuration and for approximately 900 passengers in an economy-only configuration. Airlines that expressed an interest in the A380-900 included Emirates, Virgin Atlantic, Cathay Pacific, Air France, KLM, Lufthansa, Kingfisher Airlines, and leasing company ILFC. In May 2010, Airbus announced that A380-900 development would be postponed until production of the A380-800 stabilised.
On 11 December 2014, at the annual Airbus Investor Day forum, Airbus CEO Fabrice Bregier controversially announced, "We will one day launch an A380neo and one day launch a stretched A380". This statement followed speculation sparked by Airbus CFO Harald Wilhelm that Airbus could possibly axe the A380 ahead of its time due to softening demand.
On 15 June 2015, John Leahy, Airbus's chief operating officer for customers, stated that Airbus was again looking at the A380-900 programme. Airbus's newest concept would be a stretch of the A380-800 offering 50 seats more—not 100 seats as originally envisaged. This stretch would be tied to a potential re-engining of the A380-800. According to Flight Global, an A380-900 would make better use of the A380's existing wing.

A380neo

On 15 June 2015, Reuters reported that Airbus was discussing a stretched version of the A380 with at least six customers. This aircraft, which could also feature new engines, would accommodate an additional fifty passengers. Deliveries to customers were planned for sometime in 2020 or 2021. On 19 July 2015, Airbus CEO Fabrice Brégier stated that the company will build a new version of the A380 featuring new improved wings and new engines. Speculation about the development of a so-called A380neo had been going on for a few months after earlier press releases in 2014, and in 2015 the company was considering whether to end production of the type prior to 2018 or develop a new A380 variant. Later it was revealed that Airbus was looking at both the possibility of a longer A380 in line of the previously planned A380-900 and a new engine version, i.e. A380neo. Brégier also revealed that the new variant would be ready to enter service by 2020. The engine would most likely be one of a variety of all-new options from Rolls-Royce, ranging from derivatives of the A350's XWB-84/97 to the future Advance project due at around 2020.
On 3 June 2016, Emirates President Tim Clark stated that talks between Emirates and Airbus on the A380neo have "lapsed". On 12 June 2017, Fabrice Brégier confirmed that Airbus would not launch an A380neo, stating "...there is no business case to do that, this is absolutely clear." However, Brégier stated it would not stop Airbus from looking at what could be done to improve the performance of the aircraft. One such proposal is a wingspan extension to reduce drag and increase fuel efficiency by 4%, though further increase is likely to be seen on the aircraft with new Sharklets like on the A380plus.

A380plus

At the June 2017 Paris Air Show, Airbus proposed an A380plus enhanced version with 13% lower costs per seat, featuring up to 80 more seats through better use of cabin space, split scimitar winglets and wing refinements allowing a 4% fuel economy improvement, and longer aircraft maintenance intervals with less downtime. Its maximum takeoff weight would have been increased by to, allowing it to carry more passengers over the same 8,200 nmi range or increase the range by 300 nm.
Winglet mockups, 4.7m high, were displayed on the MSN04 test aircraft at Le Bourget. Wing twist would have been modified and camber changed by increasing its height by 33 mm between Rib 10 and Rib 30, along with upper-belly fairing improvements. The in-flight entertainment, the flight management system and the fuel pumps would be from the A350 to reduce weight and improve reliability and fuel economy. Light checks would be required after 1,000 hr instead of 750 hr and heavy check downtime would be reduced to keep the aircraft flying for six days more per year.

Market

Size

In its 2000 Global Market Forecast, Airbus estimated a demand for 1,235 passenger Very Large Aircraft, with more than 400 seats: 360 up to 2009 and 875 by 2019.
In late 2003, Boeing forecast 320 “Boeing 747 and larger” passenger aircraft over 20 years, close to the 298 orders actually placed for the A380 and 747-8 passenger airliners as of March 2020.
In 2007, Airbus estimated a demand for 1,283 VLAs in the following 20 years if airport congestion remains constant, up to 1,771 VLAs if congestion increases, with most deliveries in Asia-Pacific, and 415 very large, 120-tonne plus freighters. For the same period, Boeing was estimating the demand for 590 large passenger airliners and 630 freighters.
Estimates for the total over a twenty-year period have varied from 400 to over 1,700.

Frequency and capacity

In 2013, Cathay Pacific and Singapore Airlines needed to balance frequency and capacity. China Southern struggled for two years to use its A380s from Beijing, and finally received Boeing 787s in its base in Guangzhou, but where it cannot command a premium, unlike Beijing or Shanghai. In 2013, Air France withdrew A380 services to Singapore and Montreal and switched to smaller aircraft.
In 2014, British Airways replaced three 777 flights between London and Los Angeles with two A380 per day. Emirates' Tim Clark saw a large potential for Asian A380-users, and criticised Airbus' marketing efforts. As many business travellers prefer more choices offered by greater flight frequency achieved by flying any given route multiple times on smaller aircraft, rather than fewer flights on larger planes, United Airlines observed the A380 "just doesn't really work for us". It employs Boeing 787s operating at a lower trip cost.
At the A380 launch, most Europe-Asia and transpacific routes used Boeing 747-400s at fairly low frequencies but, since then, routes proliferated with open skies, and most airlines downsized, offering higher frequencies and more routes.
The huge capacity offered by each flight eroded the yield: North America was viewed as 17% of the market but the A380 never materialised as a 747 replacement, with only 15 747s remaining in passenger service in November 2017 for transpacific routes, where time zones restrict potential frequency. Consolidation changed the networks, and US majors constrained capacity and emphasised daily frequencies for business traffic with midsize widebodies like the 787, to extract higher yields; the focus being on profits, with market share ceded to Asian carriers.
The 747 was largely replaced on transatlantic flights by the 767, and on the transpacific market by the 777; newer, smaller aircraft with similar seat-mile costs have lower trip costs and allow more direct routes.
Cabin 'densification', to lower unit costs, could aggravate this overcapacity.

Production

In 2005, 270 sales were necessary to attain break-even and with 751 expected deliveries its internal rate of return outlook was at 19%, but due to disruptions in the ramp-up leading to overcosts and delayed deliveries, it increased to 420 in 2006. In 2010, EADS CFO Hans Peter Ring said that break-even could be achieved by 2015 when 200 deliveries were projected. In 2012, Airbus clarified that the aircraft production costs would be less than its sales price.
On 11 December 2014, Airbus chief financial officer Harald Wilhelm hinted the possibility of ending the programme in 2018, disappointing Emirates president Tim Clark. Airbus shares fell down consequently. Airbus responded to the protests by playing down the possibility the A380 would be abandoned, instead emphasising that enhancing the aeroplane was a likelier scenario. On 22 December 2014, as the jet was about to break even, Airbus CEO Fabrice Brégier ruled out cancelling it.
Ten years after its first flight, Brégier said it was "almost certainly introduced ten years too early". While no longer losing money on each plane sold, Airbus admits that the company will never recoup the $25 billion investment it made in the project.
Airbus consistently forecast 1,400 VLA demand over 20-year, still in 2017, and aimed to secure a 50% share, up to 700 units, but delivered
215 aircraft in 10 years, achieving three produced per month but not the four per month target after the ramp-up to achieve more than 350 and is now declining to 0.5 a month.
As Boeing see the VLA market as too small to retain in its 2017 forecast, its VP marketing Randy Tinseth does not believe Airbus will deliver the rest of the backlog.
Richard Aboulafia predicts a 2020 final delivery, with unpleasant losses due to "hubris, shoddy market analysis, nationalism and simple wishful thinking".
In 2017, the A380 fleet exceeded the number of remaining passenger B747s, which had declined from 740 aircraft when the A380 was launched in 2000 to 550 units when the A380 was introduced in 2007, and around 200 ten years later. However, the market-share battle has shifted to large single-aisles and 300-seat twin-aisles.

Cost

the list price of an A380 was US$432.6 million. Negotiated discounts made the actual prices much lower, and industry experts questioned whether the A380 project would ever pay for itself. The first aircraft was sold and leased back by Singapore Airlines in 2007 to Dr. Peters for $197 million.
In 2016, IAG's Willie Walsh said he could add a few, but also that he found the price of new aircraft "outrageous" and would source them from the second-hand market.
AirInsight estimates its hourly cost at $26,000, or around $50 per seat hour, which compares to $44 per seat hour for a Boeing 777-300ER, and $90 per seat hour for a Boeing 747-400 as of 2015.
As it has very large wing and tail surfaces to allow a stretch and a high empty weight per seat, its cost-per-seat advantage eroded, and the A350-1000 and 777-9 will match it.

Secondary

As of mid-2015, several airlines have expressed their interest in selling their aircraft, partially coinciding with expiring lease contracts for the aircraft. Several A380s which are in service have been offered for lease to other airlines. The suggestion has prompted concerns on the potential for new sales for Airbus, although these were dismissed by Airbus COO John Leahy who stated that "Used A380s do not compete with new A380s", stating that the second-hand market is more interesting for parties otherwise looking to buy smaller aircraft such as the Boeing 777.
After Malaysia Airlines was unable to sell or lease its six A380s, it decided to refurbish the aircraft with seating for 700 and transfer them to a subsidiary carrier for religious pilgrimage flights. As it started receiving its six A350s to replace its A380s in December 2017, the new subsidiary will serve the Hajj and Umrah market with them, starting in the third quarter of 2018 and could be expanded above six beyond 2020 to 2022. The cabin will have 36 business seats and 600 economy seats, with a 712-seat reconfiguration possible within five days. The fleet could be chartered half the year for the tourism industry like cruise shipping and will be able to operate for the next 40 years if oil prices stay low.
As they should be parked by June 2018 before reconfiguration, MAS confirmed the plans and will also use them for peak periods to high traffic markets like London.
In August 2017, it was announced that Hi Fly would lease two used aircraft. The Portuguese ACMI/charter airline will use the aircraft for markets where high capacity is needed and airports where slots are scarce. The first aircraft was scheduled to begin commercial operations during the first quarter of 2018
Hi Fly was to receive its A380s from mid-2018 in a 471-seat configuration: 399 on the main deck, 60 business-class and 12 first-class seats on the upper deck, the Singapore Airlines layout.
Hi Fly first used one of their A380s on 1 August 2018 for a one-off flight to enable Thomas Cook Airlines to repatriate passengers from Rhodes to Copenhagen following IT problems in the Greek airport. The same aircraft was then wet-leased to Norwegian to operate its evening London-New York service for several weeks in August 2018, to alleviate availability issues on its Boeing 787s affected by Trent 1000 engine problems; Air Austral also signed a deal to wet-lease an A380 from Hi Fly while one of its 787s is grounded for three months of Trent 1000 inspections.
As of December 2019, Hi Fly have leased one used A380.
Amedeo, mainly an A380 lessor and the largest with 22, mostly leased to Emirates, wants to find a use for them after their lease expires from 2022, and study if there is a demand to wet lease them.
Swiss aircraft broker Sparfell & Partners plans to convert for head-of-state or VVIP transport some of Dr. Peters' four ex-SIA A380s for under $300 million apiece, less than a new Boeing 777 or Airbus A330.
As of November 2018, Air France was planning to return five of its A380s to lessors by the end of 2019 and refurbish its other five with new interiors by 2020 for $51 million per aircraft. By July 2019, Air France revised this plan and intended to phase out all ten of its A380s by 2022, replacing them with no more than nine twin-engined wide-body aircraft. The A330-900, A350-900 or 787-9 were being evaluated as potential replacements.
Following the cancellation of the programme in February 2019, the residual value of existing aircraft is in doubt. While Amedeo argued that cancellation should benefit the value, this will depend on whether any new airlines are prepared to adopt second-hand A380s, and how many existing users continue to operate the aircraft. Even the teardown value is questionable, in that the engines, usually the most valuable part of a scrap aircraft, are not used by any other models.

Teardown and second-hand market

With four A380s leased to Singapore Airlines having been returned between October 2017 and March 2018, Dr. Peters fears a weak aftermarket and is considering scrapping them, although they are on sale for a business jet conversion, but on the other hand Airbus sees a potential for African airlines and Chinese airlines, Hajj charters and its large Gulf operators.
An A380 parted out may be worth $30 million to $50 million if it is at half-life.
Teardown specialists have declined offers for several aircraft at part-out prices due to high risk as a secondary market is uncertain with $30 to $40 million for the refurbishment, but should be between $20 to $30 million to be viable.
When the aircraft were proposed to BA, Hi Fly and Iran Air, BA did not want to replace its Boeing 747s until 2021, while Iran Air faced political uncertainty and Hi Fly did not have a convincing business case. Consequently, Dr. Peters recommended to its investors on 28 June 2018 to sell the aircraft parts with VAS Aero Services within two years for US$45 million, quickly for components like the landing gear or the APU.
Rolls-Royce Trent 900 leasing beyond March 2019 should generate US$480,000 monthly for each aircraft before selling the turbofans by 2020. With a total revenue of US$80 million per aircraft, the overall return expected is 145–155% while 72% and 81% of their debt had already been repaid.
The fifth plane coming back from SIA, owned by Doric, has been leased by Hi Fly Malta with a lease period of "nearly 6 years". Hi Fly Malta became the first operator of second-hand A380, which carries the Maltese registration number, 9H-MIP. Norwegian Long Haul briefly leased Hi Fly Malta A380 in August 2018, which operated the aircraft following engine problems with their Dreamliner fleet. Norwegian leased the A380 again in late 2018 to help deal with the passenger backlog as a result of the Gatwick Airport drone incident.
Two others returned from Singapore Airlines in the coming weeks but they could stay with an existing Asian A380 flag carrier.
The teardown value includes $32–$33 million from the engines in 2020 and $4 million from leasing them until then, while the value of a 2008 A380 would be $78.4 million in 2020 and its monthly lease in 2018 would be $929,000.
The two aircraft have returned 3.8–4.2% per year since 2008 but the 145–155% return is lower than the 220% originally forecast.
Of the nearly 500 made, 50 747-400s were sold in the secondary market, including only 25 to new customers.
These are among the first A380s delivered, lacking the improvements and weight savings of later ones.
The first two A380s delivered to Singapore Airlines flew to Tarbes, France to be scrapped. Their engines and some components had been dismantled and removed while the livery was painted over in white.
As of September 2019, Emirates initiated its A380 retirement planwhich will see the type remain in service until at least 2035by retiring two aircraft that were due for a major overhaul, and using them as parts donors for the rest of the fleet. Emirates does not see any demand in the second-hand market, but is indifferent in that the retired aircraft have already been fully written down and thus have no residual value. As further aircraft are retired, Emirates-owned airframes will continue to be used for parts, while leased airframes will be returned to the lessors.

Orders and deliveries

Fourteen customers have ordered and taken delivery of the A380 as of April 2019. Total orders for the A380 stand at 251. The biggest customer is Emirates, which has committed to order a total of 123 A380s as of 14 February 2019. One VIP order was made in 2007 but later cancelled by Airbus. The A380F version attracted 27 orders, before they were either cancelled or converted to A380-800 following the production delay and the subsequent suspension of the freighter programme.
Delivery takes place in Hamburg for customers from Europe and the Middle East and in Toulouse for customers from the rest of the world. EADS explained that deliveries in 2013 were to be slowed temporarily to accommodate replacement of the wing rib brackets where cracks were detected earlier in the existing fleet.
In 2013, in expectation of raising the number of orders placed, Airbus announced 'attractable discounts' to airlines who placed large orders for the A380. Soon after, at the November 2013 Dubai Air Show where it ordered 150 B777X, Emirates ordered 50 aircraft, totalling $20 billion.
In 2014, Airbus said that some ordered A380s might not be built for an undisclosed Japanese airline. Qantas planned to order eight more aircraft but froze its order while the airline restructured its operations. Qantas eventually cancelled its order in February 2019 amid doubts over the A380's future.
Amedeo, an aircraft lessor that ordered 20 A380s, had not found a client for the airliner and eventually cancelled their order in 2019.
Virgin Atlantic ordered six A380s in 2001 but never took delivery and later cancelled them in 2018.
, Emirates has 48 orders outstanding but due to lack of space in Dubai Airport, it deferred 12 deliveries by one year and will not take any in 2019–20 before replacing its early airliners from 2021: there are open production slots in 2019 and Airbus reduced its production rate at 12 per year for 2017–18. The real backlog is much smaller than the official 107 with 47 uncertain orders: 20 commitments for the A380-specialized lessor Amedeo which commits to production only once aircraft are placed, eight for Qantas which wants to keep its fleet at 12, six for Virgin Atlantic which does not want them any more and three ex Transaero for finance vehicle Air Accord.
At its 100th delivery ceremony, Emirates Airline head Ahmed bin Saeed Al Maktoum was hoping to order new A380s at the November 2017 Dubai Air Show the following week.
Emirates does not need the small front staircase and eleven-abreast economy of the A380plus concept, but wants Airbus to commit to continue production for at least 10 years.
On 18 January 2018, Airbus secured a preliminary agreement from Emirates for up to 36 A380s, to be delivered from 2020, valued at $16 billion at list prices. The contract was signed in February 2018, comprising a firm order for 20 A380s and options on 16 more.
In early 2019, Airbus confirmed it was in discussions with Emirates over its A380 contract.
If the A380's only stable client were to drop the type, Airbus could cease production of the superjumbo.
Emirates is at odds with Rolls-Royce over shortfalls in fuel savings from the Trent 900s, and could switch its order for 36 A380s to the smaller A350.
The A350 could also replace its provisional order for 40 Boeing 787-10s, placed in 2017, as engine margins on the 787 are insufficient for the hot Dubai weather.
On 14 February 2019, Emirates decided to cancel its order for 39 planes, opting to replace them with A350s and A330neos. Airbus stated that this cancellation would bring the A380's production to an end when the last unfilled orders are delivered in 2021.
On 21 March 2019, All Nippon Airways received its first of three A380 painted with the Sea Turtle livery. Called the ANA Blue, this A380 will be used for 3 flights a week, going from Tokyo to Honolulu and back.

Timeline

Operators

There were 228 aircraft in service with 14 operators as of 2020.
' first Airbus A380 taking off from London-Heathrow for Abu Dhabi
The A380 has been involved in two aviation occurrences and no hull loss accidents with no fatalities as of 2020.
VariantCertificationEngineThrust
A380-84112 December 2006Trent 970-84/970B-84348.31 kN
A380-84212 December 2006Trent 972-84/972B-84356.81 kN
A380-86114 December 2007Engine Alliance GP7270332.44 kN